Similar Projects
Sunview/Telfair Storm Drainage Improvement Project - City of Charlotte
Infrastructure
Conception
$3,745,000 CJ est. value
Charlotte, NC 28202

Sunview/Telfair Storm Drainage Improvement Project - City of Charlotte
Infrastructure
Conception
$3,745,000 CJ est. value
Charlotte, NC 28202

Hilton Garden Inn / Steele Creek
New Construction, Infrastructure - 90,000 SF
Design
$20,700,000 CJ est. value
Charlotte, NC 28202

Hilton Garden Inn / Steele Creek
New Construction, Infrastructure - 90,000 SF
Design
$20,700,000 CJ est. value
Charlotte, NC 28202

QuikTrip #1083 / Huntersville
New Construction, Infrastructure - 3,703 SF
Bidding
$985,000 CJ est. value
Huntersville, NC 28078

QuikTrip #1083 / Huntersville
New Construction, Infrastructure - 3,703 SF
Bidding
$985,000 CJ est. value
Huntersville, NC 28078

RFQ D/B - Stowe Regional Water Resource Recovery Facility
Addition, Infrastructure
Post-Bid
$200,000,000 CJ est. value
Charlotte, NC 28205

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Progressive Design-Build Services for Pipeline Projects
Results
NC

Main Street Upgrades Project
Results
Huntersville, NC 28078

The Shoppes of Madison Place
New Construction - 22,054 SF
Construction
$1,573,600 est. value
Charlotte, NC 28273

LakePointe
New Construction, Infrastructure
Construction
$156,000,000 CJ est. value
Charlotte, NC 28208

Birkdale Golf Club Mixed Use
New Construction, Infrastructure - 68,188 SF
Pending Verification
$45,000,000 CJ est. value
Huntersville, NC 28078

Randolph Road Medical Office Building
New Construction, Infrastructure - 117,000 SF
Pending Verification
$68,000,000 CJ est. value
Charlotte, NC 28207

Raleigh Storm Drainage Improvement Project - City of Charlotte
Infrastructure
Conception
Charlotte, NC 28263

Last Updated 11/04/2022 09:34 AM
Project Title

Mallard Creek Wastewater Reclamation Facility (WRF) Improvements Phase I (Bid Packages 2.01, 2.02, and 2.03)

Physical Address View project details and contacts
City, State (County) Charlotte, NC 28262   (Mecklenburg County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $3,042,830 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Questions deadline is extended to May 2nd at 2:00 PM EST PC/Leeper joint venture has been selected by Charlotte Water as the construction manager for the Mallard Creek Water Reclamation Facility Phase 1 Improvements project in Charlotte, North Carolina. This project includes process air and liquid and solids process train improvements that will allow the facility to expand from its current 12-mgd capacity to 14.9 mgd. Liquid process train improvements include a new influent pumping station, new flow equalization facilities, new alkalinity storage and feed facilities, and plant drain piping improvements for centrate equalization. Work to the solids process train includes a new sludge screening facility and improvements to the primary sludge pumping station, solids handling building, dewatered cake storage pad, and digester sludge heating and biogas safety processes. PC/Leeper will work with engineers Brown and Caldwell and CDM Smith on this project. Construction is expected to begin in late 2022 with completion scheduled for January 2027. For questions please contact Melinda Lindsay PC-Leeper, A Joint Venture 7085 Old Plank Rd. Stanley, NC 28164 Headworks, EQ storage, chemical improvements, new screenings facilities, new influent pump station, solids handling improvements and odor control. PC/Leeper joint venture has been selected by Charlotte Water as the construction manager for the Mallard Creek Water Reclamation Facility Phase 1 Improvements project in Charlotte, North Carolina. This project includes process air and liquid and solids process train improvements that will allow the facility to expand from its current 12-mgd capacity to 14.9 mgd. Liquid process train improvements include a new influent pumping station, new flow equalization facilities, new alkalinity storage and feed facilities, and plant drain piping improvements for centrate equalization. Work to the solids process train includes a new sludge screening facility and improvements to the primary sludge pumping station, solids handling building, dewatered cake storage pad, and digester sludge heating and biogas safety processes. PC/Leeper will work with engineers Brown and Caldwell and CDM Smith on this project. Construction is expected to begin in late 2022 with completion scheduled for January 2027. Bid Results :: Bid Packages 2.01 :: Harper General Contractors :: $1,953,340 Bid Packages 2.02 :: Harper General Contractors :: $767,600.00 "Bid Packages 2.03 :: Ruby Collins, Inc.:: $321,890.00 "

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents