Similar Projects
Educational Science and Horticulture Site Utility Replacements - GPC
Infrastructure, Alteration
Bidding
$1,600,000 est. value
Madison, WI

Air Filtration Installation
Alteration
Bidding
Sun Prairie, WI

Refrigerant Monitoring System Replacement
Post-Bid
Less than $150,000 est. value
Madison, WI

Motor Generator Upgrade
Renovation
Post-Bid
Madison, WI

Air Compressor Replacement
Results
Less than $50,000 est. value
Madison, WI 53703

Utility Renovations - Mechanical
Results
Less than $3,000,000 est. value
Madison, WI 53703

Charter Street Heating Plant
Alteration
Bidding
Madison, WI 53715

HVAC and Mechanical Products
Term Contract
Post-Bid

Utility Renovations
Results
Less than $3,000,000 est. value
Madison, WI 53703

Pressure Reducing Valves Replacement Charter Street Heating Plant
Alteration
Bidding
Madison, WI 53715

NWHC Replacement of Air Handling Unit - FS-06
Post-Bid
Madison, WI

Heim Building AC Replacement
Results
Madison, WI 53713

Supply, Delivery and Incidental Install of LP Gas Heated Pressure Washers for the Nine Federal Flood Risk Management Structures (Fox River Dams), Wisconsin
Post-Bid

Lakeside Cottage B Boiler Replacement
Results
Less than $232,000 est. value
Madison, WI 53704

Heating Systems Repair/Replace, Clean & Tune
Alteration
Post-Bid

Last Updated 03/28/2022 10:20 AM
Project Title

Environmental Health and Safety Central Utility Connections - GPC

Physical Address View project details and contacts
City, State (County) Madison, WI 53715   (Dane County)
Category(s) Single Trades
Sub-Category(s) HVAC, Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,350,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Extending central campus utilities east of the Environmental Health & Safety building located at 30 E Campus Mall underneath East Campus Mall/Murray Street into the Environmental Health & Safety building. Connections for high-pressure steam, pumped condensate return, and compressed air will be made in utility pit #14.2-13 and extended through a direct buried piping. Chilled water supply and return will connect to direct buried lines running north-south, located west of the utility pit and extended into the building. A new pressure reducing valve (PRV) will be installed and the boilers will be removed and replaced with a steam to hot water converter. The cooling tower will be removed and a new plate heat exchanger will be installed for each of the two chilled water systems connected to central campus utilities.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Heating Boilers, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents