Last Updated | 03/28/2022 10:20 AM |
Project Title | Environmental Health and Safety Central Utility Connections - GPC |
Physical Address | View project details and contacts |
City, State (County) | Madison, WI 53715 (Dane County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC, Mechanical |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $1,350,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Extending central campus utilities east of the Environmental Health & Safety building located at 30 E Campus Mall underneath East Campus Mall/Murray Street into the Environmental Health & Safety building. Connections for high-pressure steam, pumped condensate return, and compressed air will be made in utility pit #14.2-13 and extended through a direct buried piping. Chilled water supply and return will connect to direct buried lines running north-south, located west of the utility pit and extended into the building. A new pressure reducing valve (PRV) will be installed and the boilers will be removed and replaced with a steam to hot water converter. The cooling tower will be removed and a new plate heat exchanger will be installed for each of the two chilled water systems connected to central campus utilities. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |