Similar Projects
Solon Springs - Superior
Infrastructure
Conception
$500,000 CJ est. value
Poplar, WI 54864

UW Superior - ESPC - 1 MW Solar Array - University of Wisconsin System - Administration
Infrastructure
Design
$1,651,000 est. value
Superior, WI

Culvert Replacement on Balsom Bend Road
Infrastructure
Bidding
$2,075,973 CJ est. value
Maple, WI 54854

Jack Pine Avenue RR Crossing
Infrastructure
Bidding
$300,000 CJ est. value
Solon Springs, WI 54873

Parking Lot Asphalt Repairs - Rebid
Infrastructure
Post-Bid
$50,000 CJ est. value
Superior, WI 54880

Fraser Shipyards Dry Dock No. 2 Pump Re-Routing
Infrastructure
Post-Bid
$135,000 CJ est. value
Superior, WI 54880

Barker's Island SOGL Site Improvements Project
Infrastructure
Results
$1,342,025 CJ est. value
Superior, WI 54880

N 28th St & Tower Avenue Sanitary Sewer Replacement
Infrastructure
Results
$57,232 CJ est. value
Superior, WI 54880

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Lake Nebagamon Boat Landing Repairs
Infrastructure
Bidding
$121,215 CJ est. value
Lake Nebagamon, WI 54849

Hill Avenue Interceptor Cured-In-Place Pipe Lining Stinson to Kirk Rolson
Infrastructure
Post-Bid
$826,253 CJ est. value
Superior, WI 54880

Hazel Prairie Gravel and Pulverize
Infrastructure
Results
$82,669 CJ est. value
Lake Nebagamon, WI 54849

Pavement Marking Services 2024
Infrastructure
Bidding
$60,000 CJ est. value
Superior, WI 54880

Repaving of Superior Town Hall Parking Lot and Paving of Fire Hall Parking Lot
Infrastructure
Post-Bid
$400,000 CJ est. value
Superior, WI 54880

Francis Willard Road Gravel and Pulverize
Infrastructure
Results
$12,029 CJ est. value
Lake Nebagamon, WI 54849

Last Updated 02/14/2024 12:16 PM
Project Title

Nemadji Trail Energy Center

Physical Address View project details and contacts
City, State (County) Superior, WI 54880   (Douglas County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Power Plant, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected May 2024 , Construction documents
Bids Due View project details and contacts
Estimated Value $700,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for new construction of a 650-megawatt natural gas power generation facility. In December 2023, the project received federal approval. An architect has been selected. Although a firm timeline has not been determined, the project is anticipated for bid/ construction start in 2024.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, High-Performance Structural Concrete, Concrete Finishing, Specialty Placed Concrete, Precast Structural Concrete, Precast Concrete Specialties.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Access Doors and Panels, Coiling Doors and Grilles, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Safety Specialties, Emergency Aid Specialties, Fire Protection Specialties, Exterior Specialties, Security Mirrors and Domes.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment, Security Equipment.
Division 13 - Special Construction, Radiation Protection, Special Instrumentation, Seismic Instrumentation.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Personal Protection Systems, Electronic Detection and Alarm, Fire Detection and Alarm, Radiation Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Grading, Earthwork Methods, Soil Treatment, Soil Stabilization.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Fuel Distribution Utilities, Electrical Utilities, Electrical Utility Transmission and Distribution, Utility Substations, Utility Transformers, High-Voltage Switchgear and Protection Devices, Medium-Voltage Utility Switchgear and Protection Devices, Communications Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors, Cranes and Hoists.
Division 46 - Water and Wastewater Equipment.
Division 48 - Electrical Power Generation, Common Work Results for Electrical Power Generation, Instrumentation and Control for Electrical Power Generation, Electrical Power Generation Equipment, Electrical Power Generation Testing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents