Similar Projects
Harmony School of Science - El Paso (Addison Phase II)
New Construction - 94,000 SF
Bidding
$17,000,000 est. value
El Paso, TX 79928

Construction of the Montwood High School Campus Improvement
New Construction
Post-Bid
El Paso, TX

District Wide Portable Buildings Relocation
Post-Bid
El Paso, TX 79925

Districtwide Elevator Rehabilitation Project
Results
El Paso, TX

Canutillo Independent School District Cafeteria Upgrades No. 2
New Construction
Results
Canutillo, TX 79835

Hanks Middle School - Package 1 (Demo)
Construction
El Paso, TX 79936

Canyon Hills Building A Elevator Rehabilitation
Post-Bid
El Paso, TX 79904

Job Order Contracting and Facilities Construction Services State of New Mexico
New Construction
Results
El Paso, TX

Hanks Middle School - Package 2 (General Construction)
New Construction
Post-Bid
El Paso, TX 79936

Job Order Contracting and Facilities Construction Services - State of Texas
New Construction
Results
El Paso, TX

New Combo School - Eastlake
New Construction
Post-Bid
El Paso, TX 79928

New Student Activity Complex
New Construction
Results
El Paso, TX

Construction of the Americas High School Improvements
Post-Bid
El Paso, TX 79936

Single Step Process for BP1910 Rio Bravo MS, Parkland HS and Ysleta HS Upgrades and Renovations
Renovation
Results
$22,000,000 est. value
El Paso, TX 79907

Bel Air High School Campus Improvements - Package 3 Grading
Post-Bid
El Paso, TX 79915

Last Updated 02/17/2022 10:36 AM
Project Title

Single Step Process for BP1907 Riverside HS CTE Additions and Renovations

Physical Address View project details and contacts
City, State (County) El Paso, TX 79915   (El Paso County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $22,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The goal is to renovate the existing building "A" by replacing existing evaporative air conditioning systems with new refrigerated system. Renovate existing building "B" with cosmetic finishes, demolish building "C" and provide a new building "C" on Vocational Drive and remodel existing building "D". The project is to be constructed in three phases.

Details

Middle/Senior High School, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents