Similar Projects
Parking Lot/Road Maintenance
Infrastructure
Bidding
$30,000 to $70,000 est. value
Eau Claire, WI

Parking Lot/Road Maintenance
Infrastructure
Bidding
$30,000 to $70,000 est. value
Eau Claire, WI

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Asphalt Reconstruction
Post-Bid
Seymour, WI

Resurface & Expand Privately Owned Vehicle Parking - General
Results
$340,000 est. value
Eau Claire, WI 54702

Stabilized Full Depth Reclamation
Post-Bid
Altoona, WI

Seymour - Angelica, STH 54 - Lake Road
Results
Angelica, Seymour, WI 54107

Polymer Overlay for Concrete Decks
Post-Bid
Altoona, WI

Durand - Eau Claire, Rock Creek Bridge, B-17-0226
Results
Durand, Eau Claire, WI 54736

Bremer Ridge Road Hot Mix Blacktop
Post-Bid
WI 54612

Eau Claire, N. Clairemont Avenue, Sth 312 To County Line Road
Results
Eau Claire, WI 54701

Longfellow Parking Lot And Playground
Renovation
Post-Bid
Eau Claire, WI 54703

Last Updated 11/13/2021 12:09 AM
Project Title

Mondovi - Eau Claire, USH 10 to STH 85

Physical Address View project details and contacts
City, State (County) (Buffalo, Eau Claire Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

STH 37; 15.177 Miles; Excavation, Base, HMA Pavement, Curb and Gutter, Beam Guard, Pavement Marking, and Structure Rehabilitation. Excavation Common, 266 CY; Borrow, 4,718 CY; Base Aggregate Dense, 11,750 Ton; Marking Epoxy, 100,650 LF; Construction Staking, 85,406 LF; Construction Staking, 2 LS; Concrete Curb and Gutter, 470 LF; Beam Guard, 2,812 LF; Beam Guard Energy Absorbing Terminals, 37 Each; HMA Pavement, 58,258 Ton; Removing Asphaltic Surface Milling, 276,710 SY; Tack Coat, 36,865 Gals.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents