Similar Projects
New Police Headquarters Design
Design
Lynchburg, VA

CMAR for Fire Station No. 8
New Construction
Design
$25,004,000 est. value
Arlington, VA 22201

Tysons Fire Station 29 and Bus Transit Facility
New Construction - 20,000 SF
Bidding
Less than $12,250,000 est. value
McLean, VA 22035

Design/Build Of Fire Station #11
New Construction - 14,000 SF
Bidding
$5,000,000 est. value
Norfolk, VA

Architectural and Engineering Services for Renovation and Possible Expansion of the Mason District Police Station
Renovation, Addition
Post-Bid
Annandale, VA 22003

Design and Construction of the Police Division Firing Range
Addition - 1,200 SF
Post-Bid
Sandston, VA

Greensville Sheriffs Office Addition & Renovation
Renovation, Addition - 7,192 SF
Results
Emporia, VA

Y--P542, TBS Fire Station, Located at MCB Quantico, Quantico, Virginia
- 24,779 SF
Results
$10,000,000 est. value
Quantico, VA

Public Safety Firing Range
New Construction - 61,000 SF
Construction
$25,900,000 est. value
Leesburg, VA

Construction of Police Headquarters Building and Public Parking Garage
New Construction - 161,000 SF
Construction
$21,000,000 est. value
Blacksburg, VA

Mason District Police Station
Renovation - 22,500 SF
Design
$15,000,000 est. value
Annandale, VA 20151

Area 8 Office Reroof
Renovation - 7,297 SF
Bidding
Glen Allen, VA 23060

Burn Building Construction
New Construction - 2,279 SF
Post-Bid
VA

Fire Department Improvements Phase II
Results
$153,867 est. value
Christiansburg, VA

Chesterfield County Fire Station Facility 25
Construction
$6,256,804 est. value
Chesterfield, VA

Reported 02/07/2020 12:35 PM
Project Title

Replacement of Nokesville Volunteer Fire Station No. 5

Physical Address View project details and contacts
City, State (County) Nokesville, VA 20181   (Prince William County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method
Project Status Construction Commenced second quarter, Construction Complete as of third quarter 2019
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of, but is not limited to, construction of a new station to replace the existing Station on the same site. The new 18,233 square foot Station features a 3-lane; drive-thru Apparatus Bay with support areas on each side. The new Station also includes the Watch Room, Offices, Day Room/Kitchen, Fitness Room, 5 Bunk Rooms, and Men's/Women's Lockers, a Storage Mezzanine and training tower. The facility will also house a Multi-purpose Room available for training and community use.

Details

Fire/Police Station, Approximately 18,233 SF New Construction, Building.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents