Similar Projects
Union Market Gateway
New Construction - 52,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Washington, DC 20002

Capitol Point North
New Construction - 31,505 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Washington, DC 20002

Bearden Arts Building
New Construction - 26,000 SF
Design
Washington, DC 20002

Adams Morgan Heights
New Construction - 7,275 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Washington, DC 20008

The Flats at South Capitol
New Construction - 107,068 SF
Sub-Bidding
$10,000,000 CJ est. value
Washington, DC 20032

H.R. Crawford Gardens
New Construction - 75,000 SF
Sub-Bidding
$5,000,000 to $10,000,000 CJ est. value
Washington, DC 20019

Art Place At Fort Totten
New Construction - 885,000 SF
Post-Bid
$225,000,000 est. value
Washington, DC

2100 M Street NW
New Construction, Renovation, Addition - 420,244 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Washington, DC 20037

Redevelopment of Fletcher-Johnson
Results
Washington, DC 20019

3701 New Hampshire Avenue Northwest - Apartments
New Construction - 3,000 SF
Construction
Washington, DC 20010

500 and 530 Morse Street NE
New Construction - 20,290 SF
Construction
$88,000,000 est. value
Washington, DC 20002

1101-1107 H Street
New Construction - 6,300 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Washington, DC

14th Street Northwest
New Construction - 2,600 SF
Pending Verification
$500,000 to $1,000,000 CJ est. value
Washington, DC 20009

801 Maine Ave SW Redevelopment
New Construction, Demolition - 6,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Washington, DC 20024

Gallaudet Parcel 3
New Construction - 42,858 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Washington, DC

Reported 06/10/2022 12:00 AM
Project Title

Barry Farm - 1B

Physical Address View project details and contacts
City, State (County) Washington, DC 20020   (District of Columbia County)
Category(s) Commercial, Education, Entertainment/Recreation, Residential
Sub-Category(s) Assisted Living Facility, Fitness Center, Pre-School/Daycare, Retail
Contracting Method General Contractor to Subcontract.
Project Status Sub-Bidding, Construction Documents, Construction Start Expected June 2022, Construction Completion Expected second quarter 2024
Bids Due View project details and contacts
Estimated Value
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Assisted Living Facility, 5 Stories Above Grade, New Construction, 108 Unit(s), Retail, New Construction, Fitness Center, New Construction, Pre-School/Daycare, New Construction.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Precast Structural Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Specialty Doors and Frames, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware, Glazing, Mirrors, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Specialty Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Flagpoles.
Division 11 - Equipment, Loading Dock Equipment, Residential Equipment, Residential Appliances, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Athletic Equipment, Exercise Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Rugs and Mats, Office Furniture, Institutional Furniture, Classroom Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central HVAC Equipment.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents