Similar Projects
Foster Street Multi-Residential Development
New Construction, Infrastructure
Conception
$35,000,000 CJ est. value
Mitchell, SD 57301

Foster Street Multi-Residential Development
New Construction, Infrastructure
Conception
$35,000,000 CJ est. value
Mitchell, SD 57301

Corn Palace Renovation
Renovation, Infrastructure
Design
$42,000,000 CJ est. value
Mitchell, SD 57301

West Fifth Avenue and West Ninth Avenue Improvement - City of Mitchell
Infrastructure
Design
$1,000,000 CJ est. value
Mitchell, SD 57301

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Underground Infrastructure Inspection
Infrastructure
Post-Bid

Airport Pavement Maintenance Project
Infrastructure
Post-Bid

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Interstate Cross Road Improvements, C and G, Sidewalk and Gravity Retaining Wall
Infrastructure
Results

Lake Mitchell Dredging - City of Mitchell
Infrastructure
Pending Verification
$15,000,000 CJ est. value
Mitchell, SD 57301

Mitchell Soybean Processing Facility
New Construction, Infrastructure
Pending Verification
$500,000,000 CJ est. value
Mitchell, SD 57301

Main Street Streetscape - City of Mitchell
Infrastructure
Conception
$2,600,000 CJ est. value
Mitchell, SD 57301

Mill, AC Resurfacing, Pipe Work
Infrastructure
Design
$10,341,000 CJ est. value
Ethan, SD 57334

New Mitchell High School
New Construction, Infrastructure
Post-Bid
$30,000,000 CJ est. value
Mitchell, SD 57301

Last Updated 03/07/2023 03:33 AM
Project Title

Modify Drainage, Crossovers

Physical Address View project details and contacts
City, State (County) Mount Vernon, SD 57363   (Davison County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2025
Bids Due View project details and contacts
Estimated Value $7,552,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

I90 EBL & WBL - Fm W of Exit 319 (Mt Vernon) to 5 E of Exit 319 (Mt Vernon) Length 1.1 As of March 07, 2023, the project is in Conceptual status. Anticipated Construction year is 2025. SDDOT - Modify Drainage, Crossovers *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents