Similar Projects
Construction of the Cree Meadows Trail Project
Bidding
Ruidoso, NM 88345

Airport Road Sidewalks
Bidding
Las Cruces, NM

Construction Services
Post-Bid
Bernalillo, NM 87004

North NM 314 Bike and Pedestrian Improvements
Post-Bid
Los Lunas, NM 87031

Senior Center Service Access Parking Lot Reconstruction
Results
Las Vegas, NM

Parking Lots Improvement Project
Results
Less than $745,753 est. value
Clovis, NM

Copper King Trail Improvements
Post-Bid
Red River, NM 87558

Z--FCCO Parking Lot Rehabilitation
Results
$250,000 to $500,000 est. value
Farmington, NM 87401

Sunland Park Street Paving and Sidewalk Construction On-Call
Post-Bid
Sunland Park, NM 88063

Construction of the Tyrone Townsite ADA Improvements
Results
Silver City, NM

Sidewalk and Retaining Wall Installation
Post-Bid
Chinle, Red Valley, Window Rock, AZ - Nageezi, Pinedale, Sanostee, Tohatchi, NM 86515

On-Call Landscape Contract
Results
Less than $4,658,834 est. value
Albuquerque, NM

Parking Area
Post-Bid
Taos, NM 87710

Visitors Center Pedestrian and Trailhead Improvements NMDOT Highway Safety Improvements Program
Results
Silver City, NM 88061

Construction of the El Camino and River Walk Pedestrian and Bicycle Paths Project
Post-Bid
Las Vegas, NM 87701

Last Updated 11/19/2020 12:19 PM
Project Title

Along the Waters Trail Construction Project

Physical Address View project details and contacts
City, State (County) Farmington, NM 87401   (San Juan County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,113,802
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of approximately 1.5 miles of trail. The Animas River Trail Extension, “Among the Waters”, is the westernmost section of river trails within the City of Farmington. The trail head parking is located south of 371 Bisti Highway and west of HWY 64 along the San Juan River. The first section of existing trail is approximately .75 miles of crusher fine surface extending southwest along the river confluence and terminating at the Farmington ditch head gate. Within this portion, two pedestrian bridges will be installed and approximately 260’ of trail surfacing. Trail has been cleared/grubbed and bladed by city crews. The second section is approximately .40 miles and is the most complex as it traverses steep hillsides. Within this portion, one pedestrian bridge, approximately 3800SF of retainer walls at 7’ heights, and all trail surfacing are to be installed. Approximately half of trail has been cleared/grubbed and bladed by city crews. The third and final section is approximately .40 miles and closely parallels private property. Within this portion, all trail surfacing and work under HWY 64 bridges are to be completed. The majority of trail has been cleared/grubbed and bladed. Additionally, city crews have installed 31 light fixtures.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents