Similar Projects
Douglas County Township Roadway Improvements
Bidding
Tuscola, IL

2021 MFT Maintenance
Bidding

Central Division – Asphalt Paving Maintenance
Post-Bid

Central Division – Asphalt Paving Maintenance
Post-Bid

Bituminous Seal
Results
Less than $37,935 est. value
Atwood, IL 61913

2020 Oil and Chip Roadways
Results
Paris, IL 61944

Rock
Post-Bid
Paris, IL

Bituminous Surface Treatment
Results
Less than $24,180 est. value
Villa Grove, IL 61032

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

BAM Overlay of Birch Lane and Matteson Drive
Results
Less than $98,920 est. value
Villa Grove, IL 61956

Ramp Construction
New Construction
Results
Less than $2,421,144 est. value

4.79 Miles of Shoulder Repairs on IL 133 from Caldwell Road to Vine Street in Arthur and on Caldwell Road from CR 1900N to 1200' North of CR 1700N
Results
Arthur, IL 61911

11.36 MI of Patching Along FAI 57 from S of Arcola to N of Tuscola
Results
Arcola, Tuscola, IL

Last Updated 04/24/2021 12:51 AM
Project Title

2.579 Miles of Cape Seal Operations from ILL130 South to ILL 49

Physical Address View project details and contacts
City, State (County) (Douglas, Edgar Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

2.579 Miles of Cape Seal Operations from ILL130 South to ILL 4940400020 Each Bump Removal Base Items 350.000 40500061 Sq Yd Cape Seal Base Items 188,410.000 48102100 Ton Aggregate Wedge Shoulder, Type b Base Items 3,321.000 67100100 l Sum Mobilization Base Items 1.000 70100460 l Sum Traffic Control And Protection, Standard 701306 Base Items 1.000 70300100 Foot Short Term Pavement Marking Base Items 13,800.000 70300150 Sq Ft Short Term Pavement Marking Removal Base Items 2,258.000 70300210 Sq Ft Temporary Pavement Marking Letters And Symbols Base Items 234.000 70300220 Foot Temporary Pavement Marking - Line 4" Base Items 160,796.000 70300240 Foot Temporary Pavement Marking - Line 6" Base Items 109.000 70300260 Foot Temporary Pavement Marking - Line 12" Base Items 732.000 78001110 Foot Paint Pavement Marking - Line 4" Base Items 137,166.000 78009000 Sq Ft Modified Urethane Pavement Marking - Letters And Symbols Base Items 234.000 78009004 Foot Modified Urethane Pavement Marking - Line 4" Base Items 23,630.000 78009006 Foot Modified Urethane Pavement Marking - Line 6" Base Items 109.000 78009012 Foot Modified Urethane Pavement Marking - Line 12" Base Items 732.000 78100100 Each Raised Reflective Pavement Marker Base Items 1,045.000 78300200 Each Raised Reflective Pavement Marker Removal Base Items 1,045.000

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents