Similar Projects
Hickory Level Road Water Main Upgrade - City of Villa Rica
Infrastructure
Conception
$297,500 CJ est. value
Villa Rica, GA 30180

North By-Pass Utility Relocation and/or Betterments - City of Villa Rica
Infrastructure
Conception
$2,150,000 CJ est. value
Villa Rica, GA 30180

SR 16 at CR 212 / CR 833 / Beulah Church Road
Infrastructure
Design
$2,000,000 CJ est. value
Carrollton, GA 30116

SR 61 at Commerce Drive and at Meadowlark Drive
Infrastructure
Design
$500,000 CJ est. value
Villa Rica, GA 30180

Villa Rosa Lift Station Upgrades
Renovation
Bidding
$3,000,000 CJ est. value
Temple, GA 30179

New Connector Corridors for Carrollton Junior High School
Infrastructure
Bidding
$500,000 CJ est. value
Carrollton, GA 30117

RFP Construction Manager at Risk - Carroll County Administration Facility
Demolition, New Construction, Infrastructure - 62,000 SF
Post-Bid
$22,000,000 CJ est. value
Carrollton, GA 30117

The Birches on Maple
New Construction, Infrastructure - 148,000 SF
Post-Bid
$39,000,000 CJ est. value
Carrollton, GA 30117

New Roadway Construction on the Villa Rica Bypass Extending East Beginning at SR 101
Infrastructure
Results
$26,795,000 CJ est. value
Villa Rica, GA 30180

Mirror Lakes Development
New Construction, Infrastructure - 37,000 SF
Construction
$20,000,000 CJ est. value
Villa Rica, GA 30180

North Node
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Villa Rica, GA 30180

Maple Crossing Commercial Development
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Carrollton, GA 30117

Temple Street (Los Cowboys) Construction - City of Villa Rica
Infrastructure
Conception
$994,000 CJ est. value
Villa Rica, GA 30180

Pavement Preservation and Maintenance Services – District 6
Infrastructure
Post-Bid
$700,000 CJ est. value
Carrollton, GA 30117

North Candler Street Drainage Construction - City of Villa Rica
Infrastructure
Conception
$300,000 CJ est. value
Villa Rica, GA 30180

Last Updated 04/11/2023 05:07 PM
Project Title

Shoreline Lift Station - Design and Construction - City of Villa Rica

Physical Address View project details and contacts
City, State (County) Villa Rica, GA 30180   (Carroll County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope has not yet been determined. The project is included in the City of Villa Rica FY 2023 Budget. As of April 11, 2023, a design team has not been identified. A construction timeline has not been established yet. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents