Last Updated | 05/27/2021 08:12 AM |
Project Title | Otisco Lake Intake Site Improvements |
Physical Address | View project details and contacts |
City, State (County) | Marietta, NY (Onondaga County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1. Install a new raw water intake pipe located downstream of the insertion vault, along a new alignment and tying into the existing 36-inch intake pipe near the entrance gate. 2. Provide new magnetic flow metering on the new 36-inch intake pipe. The 36-inch flowmeter will be located in a new underground vault. 3. Fill and abandon unused portions of the existing 36-inch intake pipe from the insertion vault to Pit 12. 4. Fill and abandon the air removal chamber and associated 24-inch piping as well as 42-inch and 36-inch piping located downstream of pit 14. This work is an alternate bid item. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |