Similar Projects
Reconstruction of IL 78
Infrastructure
Bidding
$500,000 CJ est. value
Morrison, IL 61270

2023 City of Morrison Street Improvement Project
Infrastructure
Bidding
$400,000 CJ est. value
Morrison, IL 61270

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Erie Middle School Window Improvements
Renovation, Alteration
Post-Bid
$100,000 est. value
Erie, IL 61250

Football Field Complex Repairs
Renovation
Results
Morrison, IL 61270

Renovation Project At Washington Elementary School
Renovation
Results
Sterling, IL 61081

Exceptional Care and Training Center
New Construction, Infrastructure - 49,600 SF
Pending Verification
$27,100,000 CJ est. value
Sterling, IL 61081

Mill and Overlay With Areas of Base Repair, Sidewalk Ramp Replacement
Infrastructure
Bidding
$4,500,000 CJ est. value
Morrison, IL 61270

Toilet Room Renovations - Fulton High School
Renovation
Post-Bid
$450,000 est. value
Fulton, IL 61252

Asbestos Abatement
Renovation, Alteration
Results
Sterling, IL 61081

Parking Lot Project (Grading, Gravel Drainage)
Infrastructure
Post-Bid
$285,000 est. value
Erie, IL 61250

Oppold Marina Site Improvements
Infrastructure
Results
Sterling, IL 61081

Bond County High School Gymnasium - Cafeteria Addition
Addition
Post-Bid
$1,400,000 to $1,600,000 est. value
Sterling, IL 61081

Wallace Street Reconstruction Phase II
Infrastructure
Results
$3,051,452 CJ est. value
Sterling, IL 61081

Hot-Mix Asphalt Overlay and Associated Work of Lyman Road within Portland Township
Infrastructure
Post-Bid
$231,259 CJ est. value
Newton Township, IL 61250

Last Updated 07/20/2023 03:04 AM
Project Title

Addition and Renovation to Erie CUSD Annex Building Bid Package 2

Physical Address View project details and contacts
City, State (County) Erie, IL 61250   (Whiteside County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Middle/Senior High School, Site Development
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $13,875,846 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

ReBid of Bid Packages: ReBid Bid Package 3A - Masonty ReBid Bid Package 3B - Food Service Equipment Project scope includes but is not limited to site work, addition and renovation to an existing facility. Offers shall be on stipulated sum basis for the following Bid Packages: Bid Package 2A: Earthwork and Site Utilities - Low Bidder - Stichter Construction $304,850 Bid Package 2B: Concrete - Low Bidder - Centential Contractors of the Quad Cities, Inc. Bid Package 2C - Masonry - No bids received Bid Package 2D:Structural Steel & Steel Erection - Low Bidder - Industrial Steel Erectors $893,450 Bid Package 2E: General Trades - Low Bidder - Bush Construction $2,475,000 Bid Package 2F: Roofing & Sheetmetal - Low Bidder - Sterling Commercial Roofing inc. $794,250 Bid Package 2G: Drywall, Acoustical, & Painting - Low Bidder - Builders Sales & Service Company $1,677,000 Bid Package 2H - Glazing - Low Bidder - East Moline Glass Co. $493,300 Bid Package 2I: Food Service Equipment - No Bids Received Bid Package 2J: Fire Protection - Low Bidder - Centiential Fire Sprinkler Company $312,000 Bid Package 2K: Mechanical - Low Bidder - Ragan mechanical Inc. $3,749,000 Bid Package 2L: Electrical - Low Bidder - Tri-City Electric Company of Iowa $2,102,508 Bid Package 2M: Asphalt Pavement - Low Bidder - Stichter Construction $99,650 Sales tax on materials shall be excluded from your bid. Construction anticipated to begin June 2023. * Project estimated value is for entire project. The Architect will not receive bidder's questions after 1:00 p.m. on 11, May 2023 Email questions to Architect (Nate Stark). Telephone (voice) queries are discouraged. 1. Email: nstark@brayarch.com 2. Use the following subject line: Erie CUSD Package 2 - Bid Question

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents