Similar Projects
New Stem Research Center
Post-Bid
$198,000,000 est. value
Storrs, CT 06269

Uconn Gant Building Renovations at Stem Phase 2
Renovation
Post-Bid
Less than $1,379,067 est. value
CT

Public Safety Building Improvements
Addition - 3,500 SF
Results
Storrs, CT 06268

Horse Unit I and II Lorentzon Stables Upgrade
Results
Less than $188,250 est. value
Storrs, CT 06269

Modular Clean Room
Post-Bid
Storrs, CT 06269

Hicks and Grange Student Room Renovations
Renovation
Results
$1,000,000 est. value
Storrs, CT 06269

Torrey Life Science MCB Lab Renovations
Renovation
Post-Bid
Storrs, CT 06269

North Campus Residence Hall Renovations Phase II
Renovation
Results
Storrs, CT 06269

On-Call General Contractor Services Set-Aside Program for Projects Estimated at Under $100,000
Post-Bid
Storrs, CT 06269

North Dining Dish Room Renovation
Renovation
Results
Storrs, CT 06269

Trade Labor Contractor for Academic Renovations
Renovation
Results
Storrs, CT

Kirby Mills First Floor Renovation
Renovation
Results
Mansfield, CT

UCFM Code Remediation Hall Building
Results
Less than $100,000 est. value
Storrs, CT

Student Union Office Renovations
- 1,000 SF
Results
$100,000 to $500,000 est. value
Storrs, CT 06269

UPDC WALR Fiscal 2020
Results
Storrs, CT 06269

Last Updated 03/26/2020 08:37 AM
Project Title

West Campus Dorms Mechanical Room Repairs

Physical Address View project details and contacts
City, State (County) Storrs, CT   (Tolland County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Mechanical Room repairs in the West Campus Dorms which are located on the Storrs Campus of the University of Connecticut, Storrs, Connecticut. Work to include but not limited to: 1. Painting of walls, doors ceilings and floors 2. Replacement of sanitary drain waste & vent piping with cast-iron or galvanized steel piping 3. Replace cold and hot water piping as well as hot water return lines. Replace associated valves 4. Insulate hot water and hot water re-circulating pipes 5. Install PVC jacketing on all HW and HWR piping and fittings. Provide aluminum jacketing where pipes are in close proximity to steam lines. 6. Replace steam and condensate piping including all fittings, valves, and appurtenances 7. Insulate new steam and condensate piping and fittings 8. Install new vertical flash tanks for high pressure steam drip legs. Vent these flash tanks in the window wells. 9. Install new hot water heaters and hot water mixing valves as well as new condensate pumps and receivers. 10. Remove unused concrete pedestals in the mechanical room and repair the floor drains 11. Remove abandoned equipment, piping, valves and fittings 12. Clean out window wells and provide new LED lighting in the mechanical rooms 13. Provide electrical service for new condensate pumps, water heaters and new hot watering mixing valves. 14. Removal of all debris caused by this Contract.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating, Painting.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Facility Sanitary Sewerage, Sanitary Waste Piping Specialties, Sanitary Drains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents