Similar Projects
Harbor Administration Building Board Hearing Room & Executive Session Room Remodel
Renovation
Bidding
$3,700,000 CJ est. value
Los Angeles, CA 90731

Buildings LAC-T and PCC-II Roof Restoration Project
Renovation
Bidding
$525,000 CJ est. value
Long Beach, CA 90802

Concrete Cutting and Demolition Services
Term Contract
Sub-Bidding
$25,000 CJ est. value
Lancaster, CA 93536

Concrete Repair Program - Phase XI
Infrastructure, Alteration
Post-Bid
$169,000 est. value
West Hollywood, CA 90069

Concrete Cutting Services
Term Contract
Post-Bid
zh, CA 93510

Construction of Concrete Improvements in Residential Streets
Alteration
Results
Cerritos, CA

Place Minor Concrete and Highway Plants
Alteration
Results
$3,850,000 est. value
Los Angeles, CA 90081

Downtown Visalia Streetlights and Paving Project
Infrastructure, Alteration
Post-Bid

Outdoor Gym Concrete
Alteration
Results
$100,000 est. value
Lancaster, CA 93536

Annual Residential Street Rehabilitation Project (Phase 2B)
Term Contract
Post-Bid
Compton, CA 90221

Install Plants, Irrigation, and Prepare and Stain AC and Concrete
Alteration
Results
$830,000 est. value
City of Industry, CA 91714

Portland Cement Concrete Materials (As-Needed)
Term Contract
Post-Bid
$35,000 est. value
Palmdale, CA

Prepare and Stain Concrete
Alteration
Results
$640,000 est. value
Los Angeles, CA

RFQ Contractor - Belmont Beach and Aquatics Center
Demolition, New Construction, Infrastructure - 90,480 SF
Post-Bid
$70,000,000 CJ est. value
Long Beach, CA 90803

Individual Slab Replacement
Alteration
Results
$2,800,000 est. value
Long Beach, CA 90810

Last Updated 03/09/2023 07:01 AM
Project Title

Shelter Parking Lot

Physical Address View project details and contacts
City, State (County) Pomona, CA 91766   (Los Angeles County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $1,424,612 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be done consists of furnishing all materials, equipment, tools, labor and incidentals as required in the specifications and contract documents, for the following project. COMPLETION OF WORK: All work to be done under this subsequent contract shall be completed within 60 consecutive working days for all work beginning on the date stipulated in the written "Notice to Proceed" issued by the City Engineer. The contractor's schedule shall be prepared in so that start and completion of work occurs while adjacent schools at impacted blocks are in winter/summer recess outside of normal working hours to allow full access. Bonds. The Contractor shall secure with a responsible corporate surety or corporate sureties, satisfactory bonds conditioned upon faithful performance by the Contractor of all requirements under the contract and upon the payment of claims of material, men and laborers there-under. The Faithful Performance Bond shall be in the sum of not less than one hundred percent (100%) of the estimated aggregate amount of the payments to be made under the contract computed on the basis of the prices stated in the bid. The Faithful Performance Bond shall convert to a Warranty Bond in the amount of Fifty (50%) percent of the amount of the contract price plus all change orders, and shall cover warranty of the work and materials for a period of one year after the recordation of the Notice of Completion. The Labor and Material Bond shall be in the sum of not less than one hundred percent (100%) of the estimated aggregate amount of the payments to be made under the contract computed on the basis of the prices stated in the bid. Both bonds shall be on forms provided by the City. At the time of submitting the Faithful Performance Bond and the Labor and Material bond the insurer shall submit to the City the following: (a) the original, or certified copy of the unrevoked appointment, power of attorney, bylaws, or other instrument entitling or authorizing the person who executed the bond; or (b) a certified copy of the certificate of authority of the insurer issued by the Insurance Commissioner; or (c) a certificate from the Los Angeles County Clerk stating that the certificate of authority of the insurer has not been surrendered, revoked, canceled, annulled, or suspended or, in the event that it has, that renewed authority has been granted; or (d) copies of the insurer's most recent annual statement and quarterly statement filed with the Department of Insurance pursuant to Article 10 (commencing with Section 900) of Chapter 1 of Part 2 of Division 1 of the Insurance Code, Department of Insurance pursuant to Article 10 (commencing with Section 900) of Chapter 1 of Part 2 of Division 1 of the Insurance Code. Online Q&A Yes Q&A Deadline 02/23/2023 3:00 PM (PST) Engineers Estimate for this project is $961,000.00 Categories 237310 - Highway, Street, and Bridge Construction 237990 - Other Heavy and Civil Engineering Construction 238110 - Poured Concrete Foundation and Structure Contractors 238100 - General Contractor

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents