Similar Projects
Additional Lanes on SR-261 From Beardon Rd to Sr-3 (US-31) - ALDOT
New Construction, Infrastructure
Conception
$27,129,000 CJ est. value
Alabaster, AL 35007

Classroom and Storage Facility at Firehouse #2 - City of Alabaster
New Construction, Infrastructure
Conception
$600,000 CJ est. value
Alabaster, AL 35007

Montevallo Water Treatment Plant - Residential and Commercial Water Meters
Infrastructure
Design
$9,500,000 CJ est. value
Montevallo, AL 35115

District 31 Shopping Center - Phase 1 & 2
New Construction, Infrastructure - 350,000 SF
Design
$75,000,000 CJ est. value
Alabaster, AL 35007

Inverness Center Drive Sidewalk Phase I
Infrastructure
Bidding
$400,000 CJ est. value
Hoover, AL 35242

American Village Independence Hall & Congress Hall Project
New Construction, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Montevallo, AL 35115

Oak Mountain Trail Mass Grading
Infrastructure
Post-Bid
Pelham, AL

Appleford Sidewalk Repairs
Infrastructure
Results
$50,390 CJ est. value
Helena, AL 35080

Roadway and Utility Improvements Chelsea ABC Site
Infrastructure
Results
$573,230 CJ est. value
Chelsea, AL 35043

O'Reilly Auto Parts (HO2) #6619 / Hoover
New Construction, Infrastructure - 7,240 SF
Construction
$2,000,000 CJ est. value
Meadowbrook, AL 35242

Ascension St. Vincent's McCain Parkway Hospital
New Construction, Infrastructure - 40,000 SF
Pending Verification
$35,000,000 CJ est. value
Pelham, AL 35124

Blackridge South Phase 1
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Hoover, AL 35080

Phosphorus Limit Compliance - Design Work - City of Alabaster
Renovation
Conception
$2,500,000 CJ est. value
Alabaster, AL 35007

$PRESS - Police Station - Williams Blackstock Architects
New Construction, Infrastructure - 35,000 SF
Design
$12,000,000 CJ est. value
Alabaster, AL 35007

Phase 1 Conversion of Electrical Power Distribution System
Renovation, Infrastructure
Post-Bid
$700,000 CJ est. value
Montevallo, AL 35115

Last Updated 07/18/2023 10:04 AM
Project Title

Shelby Ridge WRF Improvements

Physical Address View project details and contacts
City, State (County) Chelsea, AL 35043   (Shelby County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $8,270,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project No- 221094 Construction of a new 1.0 mgd SBR at the existing Shelby Ridge WRF: Drum Screen 1.0 mgd SBR Bolted Steel Tanks Disk Filter In Channel UV Belt Filer Press Admin Building In general, the project includes, but is not limited to: 1. Drum Screen 2. EQ Basin Pump & Piping 3. Sequencing Batch Reactors 4. Post Equalization 5. Disc Filter 6. UV Disinfection 7. Aerobic Digester 8. Admin Building 9. Associated site work and yard piping 10. Electrical upgrades and replacements 11. Associated SCADA system upgrades C. Work or Materials by Owner: 1. Assistance draining basins, clearwell, pump suction wetwells, etc. 2. Assistance in coordination of work to minimize plant outages Pine Creek CWF Expansion & Autauga Creek CWF Improvements

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents