Similar Projects
Colfax Streetscape Improvements
Infrastructure
Design
$199,964 CJ est. value
Aurora, CO 80011

Sun Empire Industrial Park Phase 1
New Construction, Infrastructure - 828,953 SF
Design
$445,000,000 CJ est. value
Aurora, CO 80011

Parking Lot Repairs at RTI and Building 1000
Infrastructure
Bidding
$200,000 CJ est. value
Aurora, CO 80011

Dove Valley Regional Park Expansion and Renovation Construction Project
Addition, Demolition, New Construction, Infrastructure, Renovation
Bidding
$5,000,000 CJ est. value
Englewood, CO 80112

Janitorial Services
Term Contract
Sub-Bidding
Aurora, CO 80011

Portable Sanitation Services
Post-Bid

2021 Bores Treatment
Post-Bid
Greenwood Village, CO

Greenwood Gulch Undercrossing Improvements
Results
Greenwood Village, CO

Greenwood Gulch Undercrossing
Results
$250,000 to $350,000 est. value
Centennial, CO 80111

Centennial Medical Plaza
New Construction, Renovation, Infrastructure - 61,000 SF
Pending Verification
$7,000,000 CJ est. value
Centennial, CO 80112

Sun Empire Industrial Park Phase 2-3
New Construction, Infrastructure - 3,000,000 SF
Design
$1,300,000,000 CJ est. value
Aurora, CO 80011

Canyons Filing 2, 1st Amendment Lot Development Construction Project
Infrastructure
Post-Bid
Centennial, CO

2021 Infill Sidewalk Program
Results
Less than $420,825 est. value
Centennial, CO

Mainstay Suites Parking Lot Improvements
Alteration
Post-Bid
Englewood, CO 80112

Statewide Pest Control
Results

Last Updated 08/12/2022 05:04 AM
Project Title

Snow Removal

Physical Address View project details and contacts
City, State (County) Englewood, CO 80112   (Arapahoe County)
Category(s) Government/Public, Heavy and Highway, Single Trades
Sub-Category(s) Library - Public, Service/Term Contracts, Sidewalks/Parking Lot
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Arapahoe Library District is seeking proposals from qualified, reliable vendors to provide snow removal. These services will start on October 1, 2022, and end on April 30, 2023. The Library District is offering a 5-year contract with two 1-year renewals. General Requirements - Insurance Required Award Requirements - All or None Award Delivery Point Colorado, United States Question Acceptance Deadline 08/19/2022 07:00 PM EDT Questions are submitted online Yes

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Roof and Deck Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Library Equipment, Library Stack Systems, Audio-Visual Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Furniture, Institutional Furniture, Library Furniture, Book Shelves, Study Carrels, Index Card File Cabinets, Portable Audience Seating, Seat and Table Assemblies.
Division 13 - Special Construction.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents