Similar Projects
Construction Management-at-Risk (CMAR) Services for the Greenland Water Reclamation Facility (WRF)
Design
Jacksonville, FL 32202

WWTP North and South Air Stripper Tower Media Replacement
Bidding
Sarasota, FL 34236

Ocean Outfall Legislaton Program, Construction Package St-1B, Oxygenation Trains 1-7 Rehabilitation and Electrical Buildings
Bidding
$74,143,770 est. value
Miami, FL 33170

Design-Build Services for the Expansion of the Big Coppitt Wastewater Treatment Plant
Post-Bid
$4,000,000 to $7,000,000 est. value
Key West, FL 33040

Bee Ridge Water Reclamation Facility Expansion/Conversion to AWT CM at Risk Services
Addition
Post-Bid
Less than $150,000,000 est. value
Sarasota, FL 34240

Construction Manager at Risk, Northwest Water Reclamation Facility
Results
Less than $29,000,000 est. value
Saint Petersburg, FL 33710

Construction Manager at Risk Services - Embassy Hills Wastewater Treatment Plant Rehabilitation and Improvements
Results
$585,000 est. value
Port Richey, FL 34668

New Headworks and Grit Removal Facility
Construction
$11,900,000 est. value
Clearwater, FL 33756

CR 136/I-75 Wastewater Treatment Plant
Construction
Less than $1,365,194 est. value
FL

WRF Chlorine Contact Chamber Modifications
Bidding
$650,000 est. value
Ormond Beach, FL

Bee Ridge WRF Interim Process Improvements Design-Build
Post-Bid
Less than $3,000,000 est. value
Sarasota, FL 34240

Construction of Vactor Dump Site WRF#2
Results
Ocala, FL 34471

South Martin Regional Wastewater Treatment Plant Filter and Chlorine Contact Basin Improvements
Construction
Hobe Sound, FL 33455

WWTF Clarifier Drive Replacement Project
Renovation
Bidding
Atlantic Beach, FL

Northeast Water Reclamation Facility Clarifier 5 Improvements
Post-Bid
Less than $1,154,000 est. value
Saint Petersburg, FL 33702

Last Updated 03/12/2021 11:39 PM
Project Title

NE WRF Improvements

Physical Address View project details and contacts
City, State (County) Safety Harbor, FL 34695   (Pinellas County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $19,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Large-scale modification/demolition/construction project at its Northeast Water Reclamation Facility (NE WRF). The project includes retro-fitting existing picket thickeners with new stacked-tray grit removal equipment, demolishing and replacing existing primary clarifiers with new moving belt filters, demolishing an existing decommissioned irrigation tank and installing a new flow equalization tank with pulsed air mixing equipment, upgrading existing sludge blend tanks to include new covers and mixers, installing two new sludge pump stations and canopies, replacing an existing dewatering feed pump station, rehabilitating an existing sludge off-loading station, and installing all associated appurtenances to include piping, electrical, instrumentation, and controls.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents