Similar Projects
Regent and Kenosha Culvert Replacement
Infrastructure
Bidding
$300,000 est. value
Madison, WI 53705

Construction Services for North Breakwater Repairs at Racine Harbor
Infrastructure
Bidding
$700,000 est. value
Racine, WI

2021 Culvert Pipes
Post-Bid
WI

Culverts and Guardrails
Post-Bid
Waukesha, WI

Grassed Waterway System & Wetland Restoration
New Construction, Renovation
Results
Allenton, WI

Pond and Drainage System Construction
Results
$750,000 est. value
De Pere, WI

Green Bay Water Utility Dredging of Sludge Lagoon Number. 1
Infrastructure
Bidding
$60,000 est. value
Green Bay, WI

Culvert Materials
Post-Bid
WI

2021 Road Program
Results
Sussex, WI

Pammel Creek Flood Control Canal
Infrastructure
Bidding
$625,000 est. value
La Crosse, WI 54601

2021 Ditching
Post-Bid
WI

Regional Pond Construction
Results
Howard, WI 54313

Contract 2022-02 Green Acres (Street Opening)
Infrastructure
Bidding
$1,500,000 est. value
Marshfield, WI

2021 South Main Street and Drainage Improvements
Post-Bid
Rice Lake, WI

Bliss Road Alpine Inn Culvert Replacement
Results
Less than $62,000 est. value
La Crosse, WI 54601

Reported 06/22/2022 12:00 AM
Project Title

Maintenance Dredging and Culvert Replacement

Physical Address View project details and contacts
City, State (County) Columbus, WI   (Columbia County)
Category(s) Heavy and Highway
Sub-Category(s) Dredging, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $700,000
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Maintenance Dredging includes, but is not limited to, approximately 2,900 LF of creek dredging; clearing and grubbing; tree removal; and erosion and sediment control measures, surface restoration, cleanup and miscellaneous appurtenant facilities required to complete construction. Culvert Replacement includes, but is not limited to, removal and replacement of approximately 400 LF of 91"x58" HERCP culvert pipe; removal and replacement of approximately 100 LF of concrete curb and gutter; removal and replacement of approximately 245 SF of concrete sidewalk; removal and replacement of approximately 20 LF of 12" RCP storm sewer including 2 EA storm inlets, and miscellaneous appurtenances; removal and replacement of approximately 250 SY of asphalt pavement; saw cutting; work zone traffic control; and erosion and sediment control measures, surface restoration, cleanup and miscellaneous appurtenant facilities required to complete construction.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents