Similar Projects
Lift Station No. 2 Upgrades Rebid
Renovation, Infrastructure
Bidding
$875,000 CJ est. value
Manson, WA 98831

Chief Joseph Dam Spillway Monolith Sealing, Bridgeport, Washington
Renovation, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Bridgeport, WA 98813

YNHA- Housing Development
Term Contract
Post-Bid
Wishram, WA

Weatherization Residential Insulation 8550
Alteration
Results
Eatonville, WA

Rainier Community Center ADA Barrier Removal
Term Contract
Results
$1,277,240 est. value
Seattle, WA 98118

Center for the Deaf and Hard of Hearing Youth - Mechanical / Plumbing / Electrical
Alteration
Post-Bid
Vancouver, WA 98661

Hazen High School Pool Modernization
Alteration
Results
$9,100,000 est. value
Renton, WA

Downtown Stadium - Bid Packages
Alteration
Post-Bid
Spokane, WA

Fountain Restoration Project
Alteration
Results
Fife, WA 98424

District Drinking Water Outlet Mitigation
Alteration
Post-Bid
$50,000 est. value
Vancouver, WA

2023 Sewer Main Replacement Project
Infrastructure
Results
$790,188 CJ est. value
Walla Walla, WA 99362

Mount Saint Helens Sediment Retention Structure Crest Raise
Infrastructure
Post-Bid
$25,000,000 CJ est. value
Toutle, WA 98649

Fruit Valley Road Stormwater Overflow
Infrastructure
Results
$599,995 CJ est. value
Vancouver, WA 98660

Methow Valley State Airport - Helipad Project
Infrastructure
Post-Bid
$250,000 CJ est. value
Winthrop, WA 98862

Mv Finest Drydocking and Repairs
Infrastructure
Results
$400,000 CJ est. value
Port Townsend, WA 98368

Last Updated 07/26/2023 10:21 AM
Project Title

Marina Maintenance Shop Building

Physical Address View project details and contacts
City, State (County) Everett, WA 98201   (Snohomish County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $1,600,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project is to create a new shop building space for the Port of Everett's Marina Maintenance Department by enclosing an existing covered canopy area at the north end of the PORT's Waterfront Center. Work includes, but is not limited to, demolition, concrete foundations and slabs, steel framing, light gauge metal stud framing, CMU wainscoting, wall panels, windows, doors, overhead roll-up doors, landscaping, plumbing, mechanical / HVAC, and electrical work, all for a complete and operable project The PORT reserves the right to schedule additional pre-bid meetings if the PORT determines it is in its best interest. Question Deadline 07/20/2023 at 5:00 PM PT ESTIMATED COST: $1.4M - $1.6M *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents