Similar Projects
Strategic Resource Evaluation Study - Highway Construction Materials
Infrastructure
Bidding

SCOP Road Resurfacing of Citrus County CR491 from West Grover Cleveland Boulevard to West Ocala Street
Infrastructure
Bidding
$1,928,621 est. value
Lecanto, FL 34461

Resurface Pavement
Renovation
Post-Bid
Inverness, FL 34450

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Construction of Crystal River Town Square
Results
Less than $820,683 est. value
Crystal River, FL 34428

Asphalt Repair
Results
Less than $100,000 est. value

Resurfacing of Citrus County Road - North Citrus Springs Boulevard from US 41 to Withlacoochee Trail (CR39)
Results
Less than $1,225,000 est. value
Lecanto, FL 34461

Hill Street Reclamation
Results
Inverness, FL 34450

Asphalt Repair Experience Form
Results
Less than $500,000 est. value

Emergency Roadside Assistance Service (ERAS)
Results
Less than $204,400 est. value

Resurfacing/Bike Path/Trail/Drainage Improvements
Results
Less than $21,060,238 est. value
FL

Resurfacing of Citrus County Road - North Forest Ridge Boulevard from West Lake Beverly Drive to CR 491
Results
Less than $705,840 est. value
FL

Construction Services for The Beverly Hills West Septic Tank Phase-Out
Results
Beverly Hills, FL

Residential Road Resurfacing Project (FY 20/21)
Results
Less than $4,300,000 est. value
Lecanto, FL 34461

Sidewalk/Base Work/Milling and Resurfacing/Drainage Improvements
Results
Less than $925,000 est. value
Crystal River, FL 34428

Last Updated 06/07/2021 12:01 PM
Project Title

Colonade Roadway Project

Physical Address View project details and contacts
City, State (County) Inverness, FL   (Citrus County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Reclamation and rehabilitation of approximately 0.36 miles of existing asphalt roadway along Colonade Street beginning at the intersection of Forest Drive and ending at the intersection of HWY 44 W. Construction of additional roadway components including but not limited to, approximately 750 LF of sidewalk, stormwater structures, stormwater piping, curbing, grading, and swale construction.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents