Similar Projects
Fire Station 6 - City of Mansfield
New Construction
Conception
$6,000,000 CJ est. value
Mansfield, TX 76063

Fire Station #7
New Construction
Conception
$7,100,000 est. value
College Station, TX

Fire Station 2
New Construction
Design
$4,500,000 est. value
Humble, TX 77338

New Law Enforcement Center
Addition
Design
Mansfield, TX 76063

RFP Construction Manager at Risk - Construction Manager at Risk for the New Decatur Police Building
New Construction, Infrastructure
Bidding
$14,042,531 CJ est. value
Decatur, TX 76234

Fire Station
New Construction, Infrastructure
Bidding
$100,000 CJ est. value
San Juan, TX 78589

Renovations to the Existing Denton Police Headquarters Building and the Construction of a New Police Substation and Firing Range
New Construction, Renovation
Post-Bid
Denton, TX 76201

PD Locker Rooms
Renovation
Post-Bid
Balch Springs, TX

Desig-Build of Montgomery County Sheriff`s Office Fifty Yard Indoor Full Tactical Range
Results
Conroe, TX 77301

Fire Station Number 61
New Construction
Results
TX

Weatherford Public Safety Building
Construction
$12,000,000 est. value
Weatherford, TX 76086

Construction Manager at Risk Services for Police Headquarters Project
New Construction - 64,000 SF
Construction
$25,000,000 est. value
Kyle, TX 78640

Fire Station 4
New Construction
Pending Verification
$5,100,000 est. value
Killeen, TX

New Police Department and Fire Station #1
New Construction - 116,000 SF
Pending Verification
$96,700,000 est. value
Lewisville, TX 75057

Sheriffs Office Departments Reorganization
Renovation
Conception
Midland, TX 79701

Last Updated 09/27/2022 03:33 PM
Project Title

Hutto Fire Station No. 1 - Decon Renovations

Physical Address View project details and contacts
City, State (County) Hutto, TX 78634   (Williamson County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids
Project Status Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $50,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 27, 2022, plans have been submitted for permitting. A general contracting method has not been disclosed. Construction is expected to begin December 2022 and be completed April 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

270 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents