Similar Projects
CR 591 / Morningside Dr at Mill Creek / Lick Log Creek S of Hiram
Demolition, New Construction, Infrastructure
Design
$4,000,000 CJ est. value
Dallas, GA 30132

2023 Asphalt Project Contract I
Infrastructure
Bidding
$4,000,000 CJ est. value
Dallas, GA 30132

2023 Asphalt Project Contract II
Infrastructure
Bidding
$70,000 CJ est. value
Dallas, GA 30132

North Paulding High School Addition Phase I - Paulding County School District
Addition, Demolition, Renovation, Infrastructure
Sub-Bidding
$400,000 CJ est. value
Dallas, GA 30132

2022 - Parking Lot Project
Infrastructure
Post-Bid
$300,000 CJ est. value
Hiram, GA 30141

2023 Asphalt Bituminous Surface Treatment Project
Infrastructure
Post-Bid
$800,000 CJ est. value
Dallas, GA 30132

Transfer Station Scale House
New Construction, Infrastructure
Results
Dallas, GA 30132

Demolition and Reconstruction of Pavilion/Bathroom
Demolition, New Construction, Infrastructure
Results
$751,308 CJ est. value
Dallas, GA 30157

Paulding Lane Water Line Replacement Project
Infrastructure
Bidding
$100,000 CJ est. value
Dallas, GA 30132

Paulding County School District - Middle School #10
New Construction, Infrastructure - 148,000 SF
Post-Bid
$30,000,000 CJ est. value
Dallas, GA 30132

2022 - Arnold Lane (Water Main)
Infrastructure
Results
$908,251 CJ est. value
Hiram, GA 30141

Caliber Collision / Hiram
New Construction, Infrastructure - 16,413 SF
Post-Bid
$5,000,000 CJ est. value
Hiram, GA 30141

Griffin Creek Sewer at S.R. 6 Business
Infrastructure
Results
$575,217 CJ est. value
Dallas, GA 30132

Chick-fil-A #4866 / Hiram
New Construction, Infrastructure - 4,997 SF
Post-Bid
$1,600,000 CJ est. value
Hiram, GA 30141

Battlefield Trail Connector
Infrastructure
Post-Bid
$200,000 CJ est. value
Dallas, GA 30132

Last Updated 01/19/2023 12:12 PM
Project Title

Morningview Baptist Church New Sanctuary

Physical Address View project details and contacts
City, State (County) Dallas, GA 30132   (Paulding County)
Category(s) Heavy and Highway, Religious/Funeral
Sub-Category(s) Religious Facility, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is scheduled to go before Cobb County for site plan review on January 19, 2023. Construction could begin in fourth quarter 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Ornamental Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Carpeting, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties.
Division 11 - Equipment, Religious Equipment.
Division 12 - Furnishings, Religious Art, Specialty Casework, Religious Casework, Fixed Audience Seating, Pews and Benches.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents