Similar Projects
Farm Revegetation and Operation and Maintenance Services
Term Contract
Bidding
Ault, CO 80610

Buffalo Run Irrigation Replacement
Term Contract
Bidding
Commerce City, CO 80022

Cottonwood Creek Park Turf Installation
Post-Bid
Colorado Springs, CO 80920

Athletic Turf Replacement Projects
Post-Bid
Fort Collins, CO 80521

Notice of Request for Contractor Qualifications
Term Contract
Results
Thornton, CO 80229

Building One (1) Plant Maintenance
Results
Colorado Springs, CO

2021 General Mowing Services
Term Contract
Bidding
Thornton, CO

Landscaping
Post-Bid
Longmont, CO

S208--National Shrine Services Millennial Project At Fort Logan National Cemetery
Results
Denver, CO 80235

Grass Seed - Kentucky Blue Grass Mix
Term Contract
Bidding
Arvada, CO

Modular Container Irrigation Systems and Steel Planters
Post-Bid
Denver, CO 80202

Red Cross Memorial Plaza
Results
Less than $218,000 est. value
Aurora, CO 80045

Landscaping, Site Preparation and Installation of Astroturf SHR Training Facility
Alteration
Bidding
Colorado Springs, CO 80906

S208--Fort Logan National Cemetery Grounds Maintenance Base + 4 Option Years
Post-Bid
Denver, CO 80236

S208--Fort Logan Grounds Maintenance Services Base Year + 4 Option Years
Results
Denver, CO 80236

Last Updated 09/30/2021 01:53 PM
Project Title

Lily Lake Deep Fuels Reduction Project - Romo

Physical Address View project details and contacts
City, State (County) State-Wide: CO
Category(s) Single Trades
Sub-Category(s) Landscaping/Irrigation
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes felling standing trees, pruning remaining trees, removing ladder fuels, bucking dead and down material, and piling all resulting material on site for future pile burning in deep snow conditions. All work must be conducted in a manner that protects rare plants, preserves sensitive wildlife habitat, protects park visitors, and minimizes the aesthetic impacts of the work for our park visitors. The intent is to complete this contract with hand crews using hand carried chainsaws and/or non-motorized tools, off road vehicles are not permitted. Future pile burning will be conducted by Rocky Mountain National Park personnel and is not part of this contract. The Lily Lake Deep Fuels Reduction Project is approximately 599 acres, broken up into 9 Blocks, Blocks A through I.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents