Similar Projects
Oak Hill Tank Replacement - City Of Petaluma -
New Construction, Demolition, Infrastructure
Conception
$4,000,000 est. value
Petaluma, CA

Storage Tank Cleaning And Coating - WT26UT01 - City of Napa
Term Contract
Conception
$450,000 est. value
Napa, CA

La Cresta Tank Replacement - C67402122 - City Of Petaluma
New Construction, Infrastructure
Design
$2,000,000 est. value
Petaluma, CA 94952

Sunnyvale Cleanwater Program Secondary Treatment and Dewatering and Sunnyvale Cleanwater Program Existing Plan Rehabilation Project
Infrastructure
Bidding
$250,000,000 est. value
Sunnyvale, CA

Furnish and Deliver 30,000 Gallon Storage Tank
Infrastructure
Bidding
Whittier, CA

USCG Novato Demolish Water Tower and Building 125 Pump House
Demolition
Post-Bid
$250,000 to $500,000 est. value
Novato, CA

Tanks, Sumps and Accessories
Infrastructure
Post-Bid
West Sacramento, CA

Skyline Water Tank Replacement Project
Infrastructure
Results
Millbrae, CA 94030

Aboveground and Underground Storage Tanks Monitoring, Maintenance, Testing, and Repair Services
Term Contract
Results
Less than $500,000 est. value
Redwood City, CA 94063

Storage Tank Cleaning And Coating - WT24UT02 - City of Napa
Infrastructure
Conception
$450,000 est. value
Napa, CA 94558

Darrell Water Tank Replacement Project
Infrastructure
Bidding
$6,100,000 est. value
Hillsborough, CA 94010

Kern County Sheriff Lerdo Water Tank Replacement
Infrastructure
Post-Bid
Bakersfield, CA 93308

FWTP Backwash Tank Interior Cleaning
Term Contract
Results
$450,000 est. value
Sacramento, CA

Storage Tank Cleaning And Coating - WT25UT01 - City of Napa
Infrastructure
Conception
$450,000 est. value
Napa, CA 94558

Water System Repair
Alteration
Post-Bid
Placerville, CA 95667

Last Updated 07/15/2022 01:59 PM
Project Title

Walnut Tank 2 Repair and Recoat - CP76300027

Physical Address View project details and contacts
City, State (County) Simi Valley, CA 93063   (Ventura County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Schematic Drawings, Construction Start Expected October 2022, Construction Completion Expected January 2023
Bids Due View project details and contacts
Estimated Value $350,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a water / sewer project in Simi Valley, California. Conceptual plans call for site work for a water / sewer project. This project would recoat the interior of the 2 Million gallon capacity Walnut Tank No 2 The tank was constructed in 1992 and the interior was last patch repaired in 2001. A dive inspection conducted by CSI Services in 2011 identified that the tanks interior original coating had deteriorated. Tank longevity is significantly improved, cost effectively by recoating. In addition, the Waterworks Facilities Assessment conducted by Carollo Engineers in 2015 recommended to replace the cathodic protection system which has been in service for 26 years. A Seismic Evaluation completed by Kenndy Jenks in January 2021 recommends to lower the overflow inlet by 3 feet to lower the seismic hoop tensile stress on the lowest shell ring and raise the tank roof by 4 feet to increase freeboard to prevent damage to the roof and shell during an earthquake. Additional funding in the amount of 400,000 is estimated for the seismic mitigation. Design to be completed in July 2022 and construction expected to be completed in January 2023. Project is included in the City of Simi Valley's FY 2022 - 2027 CIP. Per the owner, as of July 13, 2022, the design for this project is being done in-house. A timeline for construction has not been determined. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents