Similar Projects
Pegasus Equestrian-Centered Resort
New Construction, Infrastructure
Conception
$90,000,000 CJ est. value
Oakland, OR 97462

Douglas Avenue Improvements - City of Roseburg
Infrastructure
Conception
$700,000 CJ est. value
Roseburg, OR 97470

OR 38: Hinsdale Slough Culvert
Infrastructure
Design
$1,431,000 CJ est. value
Elkton, OR 97436

RFP D/B - Glide Schools Design-Build Playground Cover
Infrastructure
Design
$325,000 CJ est. value
Glide, OR 97443

RFQ Contractor - GYoung Water Treatment System and Service Line
Renovation, Infrastructure
Bidding
$100,000 CJ est. value
Winston, OR 97496

Douglas High School Culinary Classroom
New Construction, Infrastructure - 970 SF
Post-Bid
$908,000 CJ est. value
Winston, OR 97496

Manage, Operate, Promote and Maintain the Fairgrounds Speedway
Infrastructure
Post-Bid
Roseburg, OR 97471

OR99/OR99W/OR99E Curb Ramps Project
Infrastructure
Results
$5,000,000 to $10,000,000 est. value
Roseburg, OR 97471

Stephens Street Curb Ramp Improvements
Infrastructure
Results
$350,000 to $400,000 est. value
Roseburg, OR

City of Myrtle Creek - Riverside Pump Station
Demolition, New Construction, Infrastructure
Construction
$1,494,900 CJ est. value
Myrtle Creek, OR 97457

Canyonville Solar Power Facility
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Canyonville, OR 97417

Taxiway A Extension - City of Roseburg
Infrastructure
Conception
$1,400,000 CJ est. value
Roseburg, OR 97470

South Umpqua High School Covered Walkway Enclosure
Demolition, Infrastructure, Renovation - 1,950 SF
Post-Bid
$200,000 CJ est. value
Myrtle Creek, OR 97457

Everett and State Roadway Improvements
Infrastructure
Results
$331,000 est. value
Sutherlin, OR

Douglas Avenue Water Main Replacement - City of Roseburg
Infrastructure
Conception
$900,000 CJ est. value
Roseburg, OR 97470

Last Updated 08/17/2023 11:34 PM
Project Title

Community Park Pavilion

Physical Address View project details and contacts
City, State (County) Winston, OR 97496   (Douglas County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $102,950 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

City of Winston (Owner) will be received by Andy Howell, Public Works Director, at the Administration Building located at 201 NW Douglas Blvd, Winston, OR 97496. Questions about the meaning, intent or completeness of the Bidding Documents, which may modify, change, increase, or decrease the scope of work, shall be submitted to ENGINEER in writing at least ten (10) calendar days prior to receipt of bids. I Bids will be received on a unit price basis for all of the work. No bid will be considered unless fully completed in the manner provided in the Instructions to Bidders and accompanied by a bid security executed in favor of the Owner in the amount not less than 10% of the total amount of the bid. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents