Similar Projects
Lekeitio Village Subdivision
New Construction
Conception
Nampa, ID 83687

Starpointe Subdivision
New Construction
Design
Garden City, ID 83714

Madison Town Square Apartments
New Construction
Design
Boise, ID 83704

I-86/I-15 Sys IC Reconstruction Pre Advertisement Presentation
Infrastructure
Post-Bid
ID

Culdesac Canyon Passing Lane, PH 3
Infrastructure
Post-Bid
$10,000,000 to $15,000,000 est. value

Spruce Street Road Maintenance Project
Infrastructure
Results
Less than $200,000 est. value
Sandpoint, ID 83809

SH-64, NezPerce to Drake Road
Infrastructure
Results
$100,000 to $500,000 est. value

Stillwater Estates
New Construction - 19,620 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Rathdrum, ID 83858

River Rim Ranch Golf Course
New Construction, Infrastructure
Pending Verification
Tetonia, ID 83452

Downtown Boise Revamp Projectr
Renovation - 98,000 SF
Pending Verification
$180,000,000 est. value
Boise, ID 83702

Kootenai Bunco Road Improvements
Term Contract
Design
Athol, ID 83801

Lincoln Courtyards
New Construction - 62,995 SF
Post-Bid
Jerome, ID 83338

DIJ Construct Taxilane
Infrastructure, Alteration
Results
$1,255,580 est. value
Driggs, ID 83422

Boise Ave Apartments
New Construction, Demolition - 63,318 SF
Design
Boise, ID 83706

Runway 2/20 Pavement Maintenance at Sandpoint Airport
Infrastructure
Results
Sandpoint, ID 83864

Last Updated 08/30/2022 06:03 PM
Project Title

Sweetwater Townhouses Phase II of Block 2

Physical Address View project details and contacts
City, State (County) Hailey, ID 83333   (Blaine County)
Category(s) Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Clubhouse/Social Club, Multi-Family Homes, Paving/Reconstruction, Single-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $30,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction is expected to begin late 2022. The general contractor's information was not released by the developer. All subcontractor trades are let. *This project has been awarded and all trades have been let.

Details

,, 289,170 SF - 283,188 SF. New Construction, New Construction. 5,982 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents