Similar Projects
Construct Multidisciplinary Engineering Building 2 - University of Louisville
New Construction, Infrastructure
Conception
$48,202,530 CJ est. value
Louisville, KY 40292

Metro Louisville Highway Connector - Interstate 65 and 71 - Kentucky Transportation Cabinet
Infrastructure
Conception
$950,000,000 CJ est. value
Louisville, KY 40202

The Path off Cane Run
New Construction, Infrastructure - 3,780,600 SF
Design
$40,000,000 CJ est. value
Louisville, KY 40216

Dever Golf Cart Sales and Service Center
New Construction, Infrastructure - 16,630 SF
Design
$2,500,000 CJ est. value
Louisville, KY 40245

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Kentucky Home Life Building Redevelopment
Renovation, Infrastructure - 258,333 SF
Post-Bid
$15,000,000 CJ est. value
Louisville, KY 40202

Mile of Sunshine Area Water Main Replacement Project
Infrastructure
Results
$1,000,001 to $3,000,000 est. value
Louisville, KY 40219

Helen and Railroad Avenue Water Main Replacement Project
Infrastructure
Results
$250,001 to $500,000 est. value
Louisville, KY 40216

Adventure House of You - Portland Museum - Phase 4
New Construction, Infrastructure
Construction
$1,000,000 CJ est. value
Louisville, KY 40212

Adventure House of You - Portland Museum - Phase 3
New Construction, Infrastructure
Construction
$1,500,000 CJ est. value
Louisville, KY 40212

Old New Cut Road Apartments
New Construction, Infrastructure
Pending Verification
$40,000,000 CJ est. value
Fairdale, KY 40118

Roosevelt Apartments
New Construction, Infrastructure
Pending Verification
$13,000,000 CJ est. value
Louisville, KY 40203

Cedar Creek Apartments
New Construction, Infrastructure - 5,000 SF
Conception
$120,000,000 CJ est. value
Louisville, KY 40291

Renaissance on Broadway / Louisville
New Construction, Infrastructure - 20,000 SF
Design
$20,000,000 CJ est. value
Louisville, KY 40211

Pavement Markers and Reflectors
Infrastructure
Post-Bid
$600,000 CJ est. value
Richmond, KY 40475

Last Updated 10/17/2023 10:18 AM
Project Title

Pioneer Village WQTC - UV Disinfection Upgrades

Physical Address View project details and contacts
City, State (County) Louisville, KY 40206   (Jefferson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $425,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This Contract provides for the implementation of UV disinfection at the Pioneer Village WQTC. This will require installation of the UV Disinfection Unit, Fiberglass Parshall Flume, 6 foot diameter manhole, piping, as well as construction of a concrete pad; and appurtenant work. All work shall be done in accordance to MSD's Standard Specifications. The public may attend the bid opening via inperson attendance at MSD's Main Office (700 West Liberty Street) in the Board Room. The Engineer's Construction Cost Estimate for this project is between $ 375,000.00 and $ 425,000.00 Questions received less than ten days prior to the date for opening of bids may not be answered. Only answers by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. All inquiries and questions between the bid opening and the contract awarding shall be directed, in writing, to MSD's Chief Engineer, David Johnson, P.E. Msd supplier diversity minority and woman business enterprise program policy and procedures manual (mbe/wbe program) - for construction contracts $200,000 and greater for minority business enterprise (mbe) and woman business enterprise (wbe) subcontracting participation, as amended, effective july 1, 2023, msd has adopted and implemented the revised msd supplier diversity minority and woman business enterprise program policy and procedures manual, modifying the mbe and wbe participation goals on construction services and construction-related services, in accordance with the msd disparity study (study). The study provided the factual predicate for msd to establish new mbe and wbe goals in msd contracting. The msd mbe\wbe program. If selected as "applicable" below, the contractor must subcontract at least 18.0% of the total amount of the contract bid price to certified african american minority-owned businesses, at least 2.0% of the total amount of the contract bid price to certified asian-indian american minority-owned businesses, and at least 15.0% total amount of the contract bid price to certified caucasian female businesses. If the contractor is unable to meet the goals, they must demonstrate adequate "good faith efforts" in accordance with the msd supplier diversity minority and woman business enterprise program policy and procedures manual (mbe/wbe program) - see msd mbe/wbe program - construction subcontracting goal documents and forms at website. If selected as "applicable, partial waiver" below, the contractor must subcontract a percentage of the total amount of the contract bid price to certified african american minority-owned businesses, asian-indian american minorityowned businesses, and caucasian female business as specified in the partial waiver attached hereto and as set forth in the "msd supplier diversity program. The contract will be awarded on the basis of the lowest, responsive, responsible bid, subject to the approval of the MSD Board. MSD reserves the right to reject any or all bids or waive any informality in any bid. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Description and location of Project: This Contract provides for the implementation of UV disinfection at the Pioneer Village WQTC. This will require installation of the UV Disinfection Unit, Fiberglass Parshall Flume, 6 foot diameter manhole, piping, as well as construction of a concrete pad; and appurtenant work. All work shall be done in accordance to MSD's Standard Specifications The Project Manager for this Invitation to Bid is Taylor Friesz. All inquiries and questions prior to the bid opening shall be Directed, in writing, to MSD's Project Manager, Taylor Friesz at taylor.friesz@louisvillemsd.org. Questions received less than ten days prior to the date for opening of bids may not be answered. Only answers by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. All inquiries and questions between the bid opening and the contract awarding shall be directed, in writing, to MSD's Chief Engineer, David Johnson, P.E.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents