Similar Projects
Fort Worth Academy Middle School
Renovation, Addition - 19,410 SF
Design
$2,700,000 est. value
Fort Worth, TX 76132

IDEA Rise Public School
New Construction - 27,000 SF
Design
$5,000,000 est. value
Fort Worth, TX 76116

O D Wyatt High School Renovation
Renovation
Post-Bid
Fort Worth, TX

Arlington Heights High School Addition/Renovation
Renovation, Addition
Post-Bid
Fort Worth, TX 76107

Addition and Renovations to Central and Hurst Junior High
Renovation, Addition
Results
$27,700,000 est. value
Bedford, TX

Addition and Renovations to Harwood and Bedford Junior High
Renovation, Addition
Results
$30,800,000 est. value
Bedford, TX 76210

Nolan Catholic High School
Renovation
Construction
$1,000,000 est. value
Fort Worth, TX 76103

Euless Junior High Additions and Renovations
Renovation, Addition
Construction
Bedford, TX

South Hills High School Addition/Renovation
Renovation, Addition
Post-Bid
$39,900,000 est. value
Fort Worth, TX 76133

Building Addition
Results
$37,670,000 est. value
Everman, TX 76140

North Side High School Renovation
Renovation
Construction
Less than $24,375,960 est. value
Fort Worth, TX 76164

Donna Shepard Intermediate School Renovation
Post-Bid
$2,902,000 est. value
Mansfield, TX 76063

Construction Manager at Risk for Keller ISD
Results
Keller, TX 76248

New Music Center & Senior High School Renovation
Renovation, Addition
Construction
$27,145,000 est. value
Southlake, TX

Boswell High School Athletic Additions and Renovations
Renovation, Addition
Post-Bid
Fort Worth, TX 76169

Reported 02/04/2020 10:23 AM
Project Title

Southwest High School Renovation

Physical Address View project details and contacts
City, State (County) Fort Worth, TX 76133   (Tarrant County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method
Project Status Construction Commenced fourth quarter 2019
Bids Due View project details and contacts
Estimated Value $28,507,500
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Phase 1: Summer 2019-Winter 2019 1. Robotics/Engineering Reno: Conversion of current lab and another classroom to create larger space. 2. Media Center Reno: Remodel of library to create a more functional, spacious area, including collaboration rooms 3. Front Entry Addition: Small addition and feature wall to create a grander entry to the school, the addition will create 3 usable spaces for admin features along with a secured vestibule. 4. Arts/AV Wing: Complete renovation of the current wing to create a state-of-the art Audio Visual, TV, & Graphics wing Phase 2: Winter 2019-Summer 2020 1. Mechanical Courtyard Infills: Closing in 3 mechanical yards to create interior classroom space. 2. Roof Repair Work: Repair/replacement of current roofing system. 3. Upgrade Electrical: Upgrade switchgear, install new lighting throughout, improve current electrical throughout the school where required for new technology. 4. Corridor Improvements: New ceilings throughout the school, cosmetic work to transform existing hallways, removal of lockers to create collaborative spaces or storage. 5. Science Wing- Remodel of current classrooms and labs to create a state-of-the-art science lab, classrooms, and a collaborative hallway. Phase 3: Summer 2020-Summer 2021 1. Cafeteria Improvements: New ceiling throughout cafeteria, cosmetic repairs, extend current storefront to create more space. 2. Auditorium Lobby: Extend storefront to capture the roof covered walkway for interior collaboration space and general seating. 3. Stage Ramp: Install ADA compliant ramp to the stage to replace non-compliant ramp. 4. Courtyard: Exterior improvements to current courtyard, hardscape and landscape. 5. Remaining Classroom/Admin Remodel: Cosmetic work in classrooms, new ceilings, new lighting, new technology to be installed. 6. Landscaping: Landscape removal and replacement for new entry, around campus as needed.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents