Similar Projects
Hiawatha National Forest Toilets
Demolition
Design
Gladstone, MI

Crushed Concrete
Term Contract
Sub-Bidding
Traverse City, MI 49684

Six Months of Crushed Concrete, Release and Delivery as Required
Term Contract
Sub-Bidding
Mount Clemens, MI 48043

M-99 Full Depth Concrete Repair
Post-Bid
MI

Parks Cement Bid
Alteration
Post-Bid
Holland, MI

Utility Structure and Concrete Repair
Term Contract
Results
Less than $12,280 est. value
MI

Concrete Patches, Us-12 Between Lotz to Heywood Pavt Repair
Alteration
Results
Taylor, MI

Mechanically Stabilized Earth Wall Repair and Concrete Beam Repair From High Load Hit Including Crack Injection and Carbon Fiber Wrap on I-196
Infrastructure
Construction
$209,810 CJ est. value
Wyoming, MI 49519

Miscellaneous Concrete Work
Term Contract
Sub-Bidding
Rochester Hills, MI 48307

Concrete Repair Justice Center
Alteration
Post-Bid
Marshall, MI

Papp Park Pavilion Concrete Replacement
Alteration
Results
Taylor, MI 48180

Concrete Supplies
Term Contract
Sub-Bidding
Rochester Hills, MI 48307

Cement Bricks and Blocks
Term Contract
Post-Bid
MI

Redi-Mix Concrete
Term Contract
Results
Flint, MI

Highway Maintenance Materials, Aggregates and Ready Mixed Concrete
Term Contract
Sub-Bidding
Muskegon, MI 49440

Last Updated 02/15/2023 04:12 PM
Project Title

Concrete Repair and Installation District Wide 2023

Physical Address View project details and contacts
City, State (County) Midland, MI 48640   (Midland County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Concrete Repair and Installation District Wide 2023 SCOPE: The scope of work must include, but is not limited to: General Specifications: Unless otherwise specified herein or shown on the Plans, all materials, procedures, and workmanship shall conform to the requirements of the MDOT 2013 Standard Specifications for construction. Construction Methods: o The sub-grade shall be formed by trenching or filling to the required elevation for bottom of concrete or to the bottom of the sub-base, if a sub-base is specified. The subgrade shall be thoroughly tamped or otherwise compacted. A minimum of four inches of Class A sand is required, and if not present be placed as sub-base. o Before concrete is placed, the sub-grade shall be thoroughly wetted so that the subgrade is uniformly moist, without forming wet or muddy spots. o Sub-base consisting of sand or sand gravel, shall be placed under the structure, to a 4 inch depth. o The forms shall be of wood or metal, straight and free from distortion, and of sufficient strength to resist springing during the process of depositing and finishing the concrete. The forms shall be the full depth of the concrete. They shall be set firmly on the subgrade, true to the required line and grade, and be held in place by adequate stakes, and shall be thoroughly clean and free from foreign material. Approved flexible steel or wood forms may be used for sharp curves or special sections. o Minimum thickness of the concrete are indicated on the drawings provided for each area to be replaced

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents