Similar Projects
Miller Road Extension (West of Miller Crossing subdivision) - City of Republic
Infrastructure
Conception
Less than $500,000 est. value
Republic, MO 65738

Bailey Extension 2 - City of Republic
Infrastructure
Conception
Less than $300,000 est. value
Republic, MO 65738

Pavement Resurfacing
Infrastructure
Bidding
$5,000,000 to $7,500,000 est. value

Pavement Resurfacing
Infrastructure
Bidding
$5,000,000 to $7,500,000 est. value

Repair Gravel Roadways - Disaster 4451
Infrastructure
Post-Bid
Less than $323,868 est. value
Craig, MO

Aquatic Center Parking Lot Asphalt and Curb Maintenance
Infrastructure, Alteration
Post-Bid
Willard, MO 65781

Route 9 Improvements
Results
Parkville, MO 64152

2021 Road Repairs
Infrastructure
Results
Kearney, MO

2020 CDBG Street Improvement Project
Infrastructure
Bidding
$300,000 est. value
La Plata, MO

Muegge Road
New Construction, Infrastructure
Post-Bid
Saint Charles, MO 63302

Resurface on Rouet NN from the county line to Route 5 and Route BB from Route 50 to Arthur Road
Infrastructure
Results

Street Replacement Project
Infrastructure
Bidding
$300,000 est. value
Green Park, MO 63123

Paving & Engine Room
Infrastructure
Post-Bid
Breckenridge Hills, MO 63114

Mcdonald's Drive Street Improvements
Infrastructure
Results
Perryville, MO

2022 40th Street Reconstruction
Infrastructure
Post-Bid
Riverside, MO

Last Updated 07/13/2022 07:47 AM
Project Title

2022 Road Overlay Projects

Physical Address View project details and contacts
City, State (County) Farmington, MO   (Saint Francois County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a road / highway in Farmington, Missouri. Completed plans call for site work for a road / highway; and for paving for a road / highway. Sealed bid which will be accepted by the St. Francois county commission for supplying the following: materials, equipment and/or services as specified below: Item: 2022 road overlay projects Payment for materials, equipment or services (unless otherwise agreed) will be paid within thirty (30) days from delivery date. Acceptance of bid by the county commission and notification of same will constitute a legal contract. Failure to supply the material, equipment of supplies in the manner specified will be held accountable. The county commission of St. Francois county reserves the right to reject any or all bids for any reason deemed justifiable.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents