Similar Projects
Medical and Communication Building 2000 Repairs at Forbes Field
Renovation
Design
$1,000,000 to $5,000,000 est. value
Topeka, KS

IDIQ MATOC
New Construction
Design
Kansas City, KS

EHRM Training and Admin Space Support Design - Leavenworth VAMC
Renovation
Bidding
$1,000,000 to $5,000,000 est. value
Leavenworth, KS 66048

Repair Bldg 412 HVAC Phase 2
Build-out, Renovation
Bidding
$5,000,000 CJ est. value
McConnell AFB, KS 67221

Roof Replacement Royal Valley Elementary School
Renovation - 14,900 SF
Sub-Bidding
$150,000 CJ est. value
Hoyt, KS 66440

FCA Install New Boilers, Building 13
Renovation
Sub-Bidding
$20,000,000 CJ est. value
Wichita, KS 67218

Roof Replacement and Masonry Repair at Kansas Aviation Museum Phase II
Alteration
Post-Bid
Wichita, KS 67211

Fort Riley Building 404
Renovation
Post-Bid
Fort Riley, KS 66442

Custer Hall North Wing Roof Replacement
Results
$185,000 est. value
Hays, KS 67601

JCL Cedar Roe Library - Sloped Roofing Replacement
Results
Roeland Park, KS

VISN 15 Construction Renovate EHRM Training Room-Topeka
Renovation
Design
$2,000,000 CJ est. value
Topeka, KS 66622

Repalce CRAC Unit #2 at Building 54
Renovation
Sub-Bidding
$250,000 CJ est. value
McConnell AFB, KS 67221

Canning Creek Shelter Roof Replacement - Various Locations
Alteration
Post-Bid
$25,000 to $100,000 est. value
Council Grove, KS 66846

Geology Planning Reroof
Results
$200,000 est. value
Topeka, KS 66606

Building 226 HVAC Replacement - Construction, Fort Leavenworth
Renovation
Design
$1,000,000 to $5,000,000 est. value
Fort Leavenworth, KS 66027

Last Updated 07/29/2022 03:34 AM
Project Title

RFQ Contractor - Shower House Roof Replacement

Physical Address View project details and contacts
City, State (County) Junction City, KS 66441   (Geary County)
Category(s) Government/Public, Single Trades
Sub-Category(s) Military Facility, Roofing
Contracting Method Competitive Bids
Project Status Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This is a Sources Sought Synopsis only. This notice is not a solicitation and there will not be an invitation for bid (IFB) issued at this time. This notice is a market research tool to determine the availability of qualified sources. The Kansas City, District Corps of Engineers is seeking qualified Small Business (SB) that primarily perform work under the NAICS classification 237990- "Other Heavy and Civil Engineering Construction". The applicable size standard is $39.5M. This sources sought notice will be used to make appropriate acquisition decisions. After review of the responses to this sources sought synopsis, and if the Government plans to proceed with the acquisition, a solicitation announcement will be published on the Government Port of Entry (GPE), http://SAM.gov No additional information is provided. There is no bid package or solicitation at this time. Project Location (Geographical Area), Milford Lake, Junction City, Kansas The period of performance has not been identified at this time. The estimated magnitude of this construction project is between $100,000.00 and $250,000.00. Description of Construction Requirement: The US Army Corps of Engineers, Kansas City District has a need for metal roof overlays on two (2) existing shower houses with traditional shingles. Curtis Creek Shower House - remove abandoned solar panels and piping, removing (2) inside tanks, replace existing skylights, patch roof damage if needed, replace the fascia boards, square building ends and the complete installation of the metal roofing overlay. West Rolling Hills Shower House - replace existing skylights, patch roof damage if needed, replace the fascia boards, square building ends and the complete installation of the metal roofing overlay. The Contractor shall provide all equipment, labor, supervision, and material necessary to complete the project. Responses should include the following information: 1. Business name, address, point of contact, phone number, and e-mail address. 2. Business DUNS number and Cage Code number. 3. State specific interest in providing a bid if a solicitation is issued. 4. Address capability to perform a contract of this magnitude and complexity. 5. Type of business and business size. 6. Joint Venture information, existing and potential, if applicable. 7. Offeror's Bonding Capability: a. Bonding Surety Letter. Offer must provide a letter or other documentation from a surety appearing on the Department of Treasury Circular 570 (list of approved sureties) stating that the Offeror is able to provide a bid bond and obtain Performance and Payment Bonds for a minimum of $2 million. 8. Contractor may submit examples of work done by a subcontractor if that subcontractor intends to enter into a letter of commitment with the contractor. 9. Does your firm have experience in replacing roofs Please provide 1-2 projects where your firm has constructed done roof work in the last 3-5 years (include contract number, agency/customer, duration of the project, dollar value). Please submit your responses by 1:00 P.M. CST, on 4 August 2022 to Adam Haley at adam.j.haley@usace.army.mil. Limit your responses to 15 pages. Include W912DQ22B1034 and the project title in the subject block of your email. Summary: This Sources Sought Notice is to assist the U.S Army Corps of Engineers with market research. If a solicitation is issued, it will be announced/posted on the SAM.gov website with sufficient time for all interested parties to respond. No reimbursement will be made for any costs associated with providing information in response to this announcement and any follow-up information requests. However, the information will be utilized for technical and acquisition planning. If adequate responses are not received from small business, the acquisition may be solicited as unrestricted. All data received in response to this Sources Sought Synopsis marked or designated as corporate or proprietary information will be fully protected from release outside the Government. Since this is a sources sought announcement, no debrief, evaluation letters, or results will be provided to the participants. (END OF SOURCES SOUGHT) The method of contractor selection has not been determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents