Similar Projects
Groundwater Well Field and Transmission Construction - WIF32 - City of Bozeman
Infrastructure
Conception
$7,500,000 CJ est. value
Bozeman, MT 59715

College (8th to 19th) - Construction - SIF158 - City of Bozeman
Infrastructure
Conception
$2,200,000 CJ est. value
Bozeman, MT 59715

Phase 1 Collection System Rehabilitation
Infrastructure
Design
$1,950,000 CJ est. value
Glendive, MT 59330

George Elmer Drive/Cattle Drive Roundabout Project
Infrastructure
Design
$400,000 CJ est. value
Missoula, MT 59808

Raw Water Intake, Pump Station, and Pipeline
New Construction, Infrastructure, Renovation
Bidding
$50,000 CJ est. value
Fort Smith, MT 59035

Wilsall Water District Water System Improvements
New Construction, Renovation, Infrastructure
Bidding
$400,000 CJ est. value
Wilsall, MT 59086

EHRM NextGen WiFi Upgrades
Renovation
Sub-Bidding
$500,000 CJ est. value
Helena West Side, MT 59636

Region 5 Septic Pumping
Term Contract
Sub-Bidding
Billings, MT 59101

Snow Removal Services at Various Gallatin County Locations
Infrastructure
Post-Bid
MT

2021-2022 Weatherization Program
Alteration
Post-Bid

2021 Water System Improvements
Infrastructure, Alteration
Results
$4,051,000 est. value
Bigfork, MT 59911

Cooper Street Alley Water Main Replacement Project
Infrastructure
Results
Missoula, MT

Sports Complex - Cottonwood Road Area - GF260 - City of Bozeman
Infrastructure
Conception
$370,000 CJ est. value
Bozeman, MT 59718

Coram 200,000 Gallon Water Storage Tank
Infrastructure
Bidding
$895,000 CJ est. value
Coram, MT 59912

Call for Art for Intersection Art Project
Term Contract
Sub-Bidding
Bozeman, MT 59715

Last Updated 08/05/2022 06:32 AM
Project Title

Fairview Sewer Investigation

Physical Address View project details and contacts
City, State (County) Fairview, MT 59221   (Richland County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Service/Term Contracts, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Est. Completion Date: Oct. 14, 2022 Pre-Bid Meeting Info: There will not be a pre-bid conference. 1. Base Bid: The work generally consists of video inspection and cleaning of approximately 33,500 LF of vitrified clay pipe and PVC, ranging in size from 6" to 10" in diameter. 2. Additive Alternative I: The work generally consists of video inspection and cleaning of approximately 2,000 LF of 8" diameter PVC pipe. 3. Additive Alternative II: The work generally consists of video inspection and cleaning of approximately 6,500 LF of 6" and 8" diameter PVC pipe. 4. Qualifications: CCTV operators shall have current NASSCO PACP certification. For technical questions or inquiries on obtaining paper copies of bidding and contract documents please contact the office of record at (406) 433-5617 Sidney MT.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents