Similar Projects
HVAC Replacement at Johnston Square Elementary School 016
Bidding
Baltimore, MD 21202

Replacement of HVAC Units for the 27Th Floor
Bidding
Less than $100,000 est. value
Baltimore, MD 21202

Air Conditioning Repair Services for Buses
Post-Bid
Annapolis, MD 21401

Fire Extinguishing Foam
Post-Bid
Glen Burnie, MD 21061

Construction - Install 1 - Tone Split AC Unit
Results
Fort Meade, MD

On-Call Maintenance Services for Heating Ventilation and Air Conditioning (HVAC)
Results
$100,000 to $500,000 est. value
Hanover, MD 21076

Provide Bed Shaker and Visual Smoke Alarms
Bidding
Baltimore, MD

Oil Heater Replacement at Glen Burnie Maintenance Shop
Post-Bid
Less than $50,000 est. value
Glen Burnie, MD 21061

Main Cable and Anchorage Dehumidification System Maintenance
Term Contract
Results
$1,000,001 to $2,500,001 est. value
Annapolis, MD 21409

Dust Collector Rental
Post-Bid
Curtis Bay, MD 21226

Fire Protection Systems Inspection, Testing and Tagging Services
Results

Air Handler Replacement - Sculpture Studio
Post-Bid
$70,000 to $100,000 est. value
Arnold, MD 21012

Fire Extinguisher Maintenance Services
Results
Annapolis, MD 21401

Fire Extinguisher Maintenance Services at MDOT SHA Facilities in Anne Arundel County
Post-Bid
Less than $50,000 est. value
Annapolis, Glen Burnie, MD 21601

HVAC Replacement at North County High School
Results
Glen Burnie, MD 21061

Last Updated 04/21/2021 08:17 AM
Project Title

HVAC Replacement and Fire Alarm Upgrades at North Bend Pre-K To 8 School 081

Physical Address View project details and contacts
City, State (County) Baltimore, MD 21229   (Anne Arundel County)
Category(s) Single Trades
Sub-Category(s) Fire Protection, HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work includes, but is not limited to, the replacement of the fire alarm system, addition of sprinkler piping to the whole building, and replacement of room signage throughout the building. The Work includes, but is not limited to, the replacement of five air handling units, replacement of dual temperature and heating water piping, replacement of exhaust fans, addition of air conditioning to the gym and the replacement of the domestic water heater. The work also includes the replacement of ceilings and lights in the corridors to support the HVAC piping replacement.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 05 - Metals, Structural Steel Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Miscellaneous Rough Carpentry.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents