Similar Projects
Last Updated | 04/27/2021 10:23 AM |
Project Title | Phoenix Avenue Bridge and Waterline Replacement |
Physical Address | View project details and contacts |
City, State (County) | Flagstaff, AZ (Coconino County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Bridge, Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Phoenix Avenue Bridge and Waterline Replacement Project will replace the Rio de Flag box culvert (which runs beneath Phoenix Avenue and the Zani building) and will upsize the current waterline to a 12” waterline in Phoenix Avenue from Mikes Pike to Beaver Street as part of the City’s Aging Infrastructure Program. Phoenix Avenue will be reprofiled and lowered to achieve a standard street section, roadway surface drainage issues will be addressed, edge improvements will be made, as needed, and the roadway will be repaved. This summary is not a comprehensive account of the work. |
||||||||||||||||||||||
Details | Bridge, Addition.
|
||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |