Similar Projects
Reported | 06/17/2022 12:00 AM |
Project Title | PIP-II Cryogenic Distribution System (CDS) Installation ED0016633 |
Physical Address | View project details and contacts |
City, State (County) | Batavia, IL 60510 (Kane County) |
Category(s) | Industrial/Manufacturing |
Sub-Category(s) | Manufacturing/Processing Plant |
Contracting Method | Competitive Bids. |
Project Status | Bidding, Construction Start Expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,600,000 [brand] Estimate |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Fermi National Accelerator Lab (FNAL) is in the process of constructing a new accelerator, "PIP-II" [1]. This 800 foot long superconducting linear accelerator is already under construction, and will come online in 2029. PIP-II includes a dedicated cryogenic plant providing liquid and gaseous helium to components of the accelerator. The piping system which delivers the helium from the cryoplant to the accelerator is known as the Cryogenic Distribution System (CDS). This Request For Information (RFI) is intended to solicit information from potential vendors for the installation of the CDS within the PIP-II footprint. The CDS has four major components, shown in Figure 2, within the scope of this RFI: o The Distribution Valve Box (DVB) is located within the cryoplant building and serves as the interface between the cryoplant and the CDS. o The Intermediate Transferline (ITL) runs from the cryoplant building to the accelerator tunnel. This includes both a vacuum-insulated multi-circuit cold transferline and several single-wall warm piping runs. o The Tunnel Transferline (TTL) is the piping in the accelerator's underground tunnel and includes interfaces for the accelerator components. This includes a vacuum-insulated multi-circuit cold transfer line with 26 modules (25 Bayonet Cans + 1 Turnaround Can) and several single-wall warm piping runs. o The warm gas pipe headers within CDS scope, include primarily helium gas piping as well as short sections or air, water, and nitrogen piping. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||
Details | Manufacturing/Processing Plant, Renovation.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |