Similar Projects
East Miller Road Expansion - City of Republic
Infrastructure
Conception
Less than $1,000,000 est. value
Republic, MO 65738

MM Five Lane Part 3 - City of Republic
Infrastructure
Conception
$4,000,000 est. value
Republic, MO

South Lone Pine Mixed Use
New Construction, Infrastructure - 132,600 SF
Design
$35,000,000 CJ est. value
Springfield, MO 65804

South Lone Pine Mixed Use
New Construction, Infrastructure - 132,600 SF
Design
$35,000,000 CJ est. value
Springfield, MO 65804

OTC Airframe and Powerplant Training Center
New Construction, Infrastructure - 21,690 SF
Bidding
$12,500,000 CJ est. value
Springfield, MO 65802

ADA Ramps of Various Signalized Arterial Roadways in Springfield
Infrastructure
Bidding
$500,000 CJ est. value
Springfield, MO 65806

Aquatic Center Parking Lot Asphalt and Curb Maintenance
Infrastructure, Alteration
Post-Bid
Willard, MO 65781

Aquatic Center Parking Lot Asphalt and Curb Maintenance
Infrastructure, Alteration
Post-Bid
Willard, MO 65781

Arterial Street ADA Ramp
Infrastructure
Results
Springfield, MO

Kansas Expressway Extension Phase I
Infrastructure
Results
Springfield, MO

Element By Westin - Marriott / Springfield
New Construction, Infrastructure - 71,477 SF
Construction
$22,000,000 CJ est. value
Springfield, MO 65807

Buc-ee's / Springfield
New Construction, Infrastructure - 53,000 SF
Construction
$28,000,000 CJ est. value
Springfield, MO 65803

Simply Smart Self-Storage Facility
New Construction, Infrastructure - 55,500 SF
Pending Verification
$6,000,000 CJ est. value
Republic, MO 65619

OZMOD 425
Demolition, New Construction, Infrastructure - 37,533 SF
Pending Verification
$10,500,000 CJ est. value
Springfield, MO 65803

MM Five Lane Part 2 - City of Republic
Infrastructure
Conception
$3,200,000 est. value
Republic, MO

Last Updated 07/25/2023 08:07 AM
Project Title

Stormwater Improvements - Hampton From Seminole to Cherokee

Physical Address View project details and contacts
City, State (County) Springfield, MO 65806   (Greene County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,275,348 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of April 4, 2023, project was awarded to Brothers Excavating Company, Inc. but awarded amount is not available.** The City of Springfield is seeking qualified contractors to perform stormwater improvements. This project consists of installation of approximately twothousand linear feet of underground stormwater pipe, associated inlet, and junction structures along McGee, Hampton, and Seminole. Construction includes new concrete sidewalks and driveway aprons, as well as City Utilities gas and water relocations and renewals within the general project area along Seminole, Hampton, and McGee. All wages paid for work under this Contract shall comply with requirements of the prevailing wage law of the State of Missouri, Sec 290.210 et seq., R.S. Mo., as amended by the Division of Labor Standards, State of Missouri and regulations promulgated by the Division of Labor. The City of Springfield hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. The City is committed to providing opportunities to DBE, MBE, and WBE prime, general and subcontractors and encourages such business enterprises to submit responses Question Deadline 02/07/2023 at 3:00 PM CT The cutoff for any questions pertaining to this bid

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents