Similar Projects
Elevated Water Storage Tank
New Construction, Infrastructure
Bidding
$750,000 CJ est. value
Franklin, WI 53132

Wastewater Treatment Plant (WWTP) Facility Improvements
Renovation
Bidding
$400,000 CJ est. value
Edgar, WI 54426

Pressure Reducing Valve Repairs
Infrastructure
Sub-Bidding
$460,000 CJ est. value
Bayfield, WI 54814

On-Call Plumbing Services for Headquarters, Central Laboratory, and 13th Street Facilities
Term Contract
Sub-Bidding
Milwaukee, WI 53202

District Wide Bottle Filler Stations at Central Region Locations
Alteration
Post-Bid
Milwaukee, WI

District Wide Bottle Filler Stations - Bid Package 2
Alteration
Post-Bid
Milwaukee, WI 53228

Vehicle Wash Bay & Maintenance Bay Plumbing & Pavement
Results
Appleton, WI 54911

Elevator Replacement, Roger Harring Stadium -MEP
Results
$675,000 est. value
La Crosse, WI 54601

Steam and Condensate Repairs
Renovation
Construction
$169,500 CJ est. value
Waupun, WI 53963

Steam and Condensate Repairs
Renovation
Construction
$169,500 CJ est. value
Waupun, WI 53963

Broadway Reconstruction S. 14th Street to S. 7th Street
Infrastructure
Bidding
$500,000 CJ est. value
Sheboygan, WI 53081

Detention Center Plumbing Fixtures Replacement
Alteration
Post-Bid
Kenosha, WI 53144

Rotary Valve #6-2, #6-3, #7-1, #7-2 & #7-3 Replacements
Results
Milwaukee, WI 53207

Taylor Co Chelsea Dam Repairs
Infrastructure
Bidding
$200,000 CJ est. value
Chelsea, WI 54451

Plumbers
Term Contract, Alteration
Post-Bid
Hartford, WI

Last Updated 11/21/2022 03:03 AM
Project Title

2023 Timber Drive Street and Utility Improvements

Physical Address View project details and contacts
City, State (County) Rhinelander, WI 54501   (Oneida County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $3,572,839 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This is a single contract for water main, storm sewer and sanitary sewer construction, street excavation and base course construction, street asphalt pavement construction, curb & gutter and asphalt bike path. The contract consists of the following approximate quantities: 8, 10, 12, 15-Inch Sanitary Sewer (5,130 lineal feet), 6,8,10, 12-Inch Water Main (5,110 lineal feet), 12, 15, 18, 24, 36-inch Storm Sewer (650 lineal feet), Hot-Mix Asphalt Pavement (4,500 tons), 24-Inch Concrete Curb & Gutter (9,200 lineal feet), and 8-Foot Wide Asphalt Bike Path (4,800 square yards). The quantities and the main sizes are subject to change without notice prior to document distribution. This project is partially funded by the Department of Transportation through the Local Roads Improvement Program. Bidders must be pre-qualified with the City of Rhinelander within the last year or must be pre-qualified for this work 5 days prior to the bid deadline in accordance with Section 66.0903 of the Wisconsin Statutes. Each bidder must deposit, with his bid, security in the amount of 5% of the maximum bid amount. Bidders must be experienced in municipal pipeline construction. The City of Rhinelander reserves the right to reject any and all bids and to waive informalities in any bid.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents