Last Updated | 07/20/2023 06:02 PM |
Project Title | Peter Paulson HVAC Replacement |
Physical Address | View project details and contacts |
City, State (County) | Portland, OR 97201 (Multnomah County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $200,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project consists of replacement of existing HVAC roof top unit with a new DOAS roof top unit. Replace all existing diffusers/grilles for new system as indicated in drawings. New ductless mini split unit and wall hung condensing unit in parking garage. Bidders will need to sign up for free on Bid locker to access the solicitation documents or submit a bid. Peter Paulson, located at 1530 SW 13th Ave. Portland, OR 97201, is a 93-unit apartment building built in 1995. Home Forward has an established goal of 28% participation by COBID and/or Underutilized Business Enterprise (UBE) firms. Prime contractors who do not meet the 28% goal will be required to submit proof that good faith efforts have been made to contract with these subcontractors. This project is subject to state of Oregon BOLI Prevailing Wage Requirements. The wage determination applicable for the duration of this project is the rates dated January 5, 2023 with January 11, 2023 amendment. Home Forward may reject any bid not in compliance with the prescribed bidding procedures and requirements, may reject any or all bids, and waive all informalities if doing so is determined by Home Forward to be in the public interest. The First Tier Subcontractor List, form HF-421, must be received by 4:00 p.m. on the same day, April 25, 2023. No bidder may withdraw their bid after the hour set for opening until after the lapse of sixty (60) days from the bid opening. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Contractor and all subcontractors must have a public works bond in the amount of $30,000 filed with the Construction Contractors Board (CCB) prior to the start of work on a PWR job (ORS 279C.836). The Owner must verify the Contractor's bond and the Contractor must verify all subcontractors bonds are on file prior to the start of work |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |