Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Houston Westheimer RC Emergency Generator Upgrades
Alteration
Bidding
$330,000 est. value
Houston, TX 77082

Hi-Flex Audio/Visual Technology Enhancement
Alteration
Bidding
Houston, TX 77004

On-Call Mechanical and Electrical Services for Water and Wastewater Facilities
Post-Bid
$250,000 est. value
Bellaire, TX 77401

Emergency Power for Titan Krios System
Post-Bid
Houston, TX 77030

Maintenance, Repair, and Testing of Emergency Power Units for Various Departments
Results
$6,292,327 est. value
Houston, TX 77251

Electrical Conditions and Equipment Replacement
Term Contract
Results
Less than $388,757 est. value
Houston, TX 77004

Cougar Woods Dining Hall - Full Power Generator
Alteration
Bidding
Houston, TX 77004

Generator and Control Panel for Unit 36336
Post-Bid
Houston, TX

Retail Electrical Power Services
Term Contract
Results
Houston, TX 77002

Generator Inspection, Preventative Maintenance and Repair Services
Term Contract
Bidding

Airfield Lighting Supplies
Post-Bid
Houston, TX

Uninterrupted Power Supply Maintenance Repair Services
Term Contract
Results
Houston, TX 77027

Brown Theater Dimming Rack Replacement (Phase 2)
Alteration
Bidding
Houston, TX 77002

Ballasts
Post-Bid
TX

Reported 03/18/2022 12:00 AM
Project Title

City Hall Electrical Switchgear Replacement

Physical Address View project details and contacts
City, State (County) Houston, TX 77002   (Harris County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $1,458,377
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes demolition of interior finishes/slope of Small Auditorium 108 and of electrical busway and various pieces of electrical equipment in the City Hall basement at scheduled times in the sequence of work. Construction will include: new doors and finishes to the new 1st floor electrical room, relocation of some electrical equipment to the first floor, provision of some new equipment at various locations, addition of ships ladder and concrete duct bank in the basement. This work will require great coordination between various trades and the users of the building as this site is to be fully occupied/operational during construction.

Details

Division 26 - Electrical, Medium-Voltage Switchgear, Low-Voltage Switchgear, Low-Voltage Controllers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents