Similar Projects
Michelson Water Recycling Plant Tertiary Filter Improvements
Renovation, Infrastructure
Bidding
$17,899,000 CJ est. value
Irvine, CA 92612

Water Softener System Maintenance
Term Contract
Sub-Bidding
Orange, CA 92866

Urgent Plumbing Services
Term Contract
Post-Bid
Santa Ana, CA 92701

Plumbing Maintenance Services
Term Contract
Post-Bid
Tustin, CA

Water Bottle Filling Station Replacements
Alteration
Results
$215,000 est. value
Santa Ana, CA

FY22-23 Manhole and Valve Box Adjustment
Infrastructure
Results
$591,250 CJ est. value
Yorba Linda, CA 92886

RFQ Contractor - Job Order Contract (JOC) for Plumbing Services
Term Contract
Post-Bid
Santa Ana, CA 92701

Digester #2 Structural and Mechanical Rehabilitation
Renovation
Results
$922,325 CJ est. value
San Clemente, CA 92672

Newport Beach Pump Stations Pressurization Improvements
Renovation, Infrastructure
Post-Bid
$1,412,000 CJ est. value
Santa Ana, CA 92708

Liquid Oxygen Tank A Replacement at Plant No. 2
Renovation, Infrastructure
Results
$3,300,000 CJ est. value
Huntington Beach, CA 92646

Tracks at Brea Western Extension Community Outreach and Concept Design
Infrastructure
Post-Bid
$200,000 CJ est. value
Brea, CA 92821

JRWSS Crown Valley Parkway Transmission Main Relocation
Infrastructure
Results
$3,884,665 CJ est. value
Laguna Beach, CA 92677

Citywide Plumbing Services
Term Contract
Post-Bid
$75,000 CJ est. value
Laguna Beach, CA 92677

Annual Sewer Replacement Maintenance FY 2022-2023
Infrastructure
Results
$2,744,450 CJ est. value
Orange, CA 92866

On-Call Plumbing Services
Term Contract
Post-Bid
Newport Beach, CA 92663

Last Updated 04/10/2023 06:34 PM
Project Title

Placement of Cured-In-Place Pipe (CIPP) and Manhole Rehabilitation

Physical Address View project details and contacts
City, State (County) Brea, CA 92821   (Orange County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This is an annual program to reline damaged, cracked, and broken portions of sewer mainlines city-wide. The project will establish an ongoing repair program to address identified locations of sewer mainline ranging from 6" to 18" in diameter, for relining, and the rehabilitation of selected sewer manholes. This program is not to exceed $300,000. All questions and/or contacts with City staff/representative regarding this RFP are to be directed to the following: Jerry Mestas Public Works Supervisor Phone: 714-990-7629 Email: jerryme@cityofbrea.net GENERAL SCOPE OF WORK: CONTRACTOR shall furnish all necessary labor, tools, materials, appliances, and equipment for and do the work for the Placement of Cured-in-Place Pipe (CIPP) and Manhole Rehabilitation throughout the City of Brea. Said work to be performed in accordance with specifications and standards of the "Greenbook", Part 5, Pipeline Rehabilitation, and in accordance with bid prices hereinafter mentioned and in accordance with the instruction of the Director of Public Works for a period commencing 05/01/23 through 04/30/24. The prices quoted with the bid shall be in effect until expiration of the agreement on the date stated herein. The City and CONTRACTOR shall have the option of extending the term of the agreement, by mutual consent of the parties, four (4) times for periods of one year each. Should the agreement be extended, the contract prices shall be on the Extension of Term subsection hereof.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents