Similar Projects
Peterson Dermatology
New Construction - 2,970 SF
Conception
$500,000 to $1,000,000 CJ est. value
Price, UT 84501

Medical Unit Expansion and a Short-Term Housing Building
Renovation, Addition
Design
$3,000,000 est. value
Hurricane, Saint George, UT 84737

Eagle Mountain Medical Office Building
New Construction - 11,434 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Eagle Mountain, UT 84005

IHC Transformation Center Remodel
Renovation - 967 SF
Bidding
Murray, UT 84107

IMC Neurosurgery Clinic
Renovation
Bidding
Murray, UT 84107

Intermountain Health Care PT/Workmed Remodel
Renovation - 11,900 SF
Post-Bid
Saint George, UT 84790

New Ronald Mcdonald Nbicu Family Space
Renovation - 33,359 SF
Post-Bid
Less than $2,200,000 est. value
Salt Lake City, UT 84113

ACC Transplant Buildout - CMGC
Build-Out - 15,000 SF
Results
$3,962,938 est. value
Salt Lake City, UT

Central Valley Medical Center - Phase V
Renovation, Addition - 129,409 SF
Construction
Nephi, UT 84648

Family Healthcare
New Construction - 30,352 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Saint George, UT 84790

Lehi Medical Park
New Construction - 48,000 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Lehi, UT 84043

Farmington OrthoStar
New Construction
Pending Verification
Farmington, UT 84025

Medical Building And Residential
New Construction - 38,000 SF
Design
Lehi, UT 84043

Salt Lake Clinic Refresh
Renovation
Bidding
Salt Lake City, UT 84102

South Jordan Health Center Remodel
Renovation
Post-Bid
South Jordan, UT 84009

Reported 05/26/2022 03:04 PM
Project Title

RMU Tower Tenant Improvements

Physical Address View project details and contacts
City, State (County) Provo, UT 84606   (Utah County)
Category(s) Medical
Sub-Category(s) Medical Office/Outpatient
Contracting Method
Project Status Construction Commenced March 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Medical Office/Outpatient, 121,678 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Wall Coverings, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving.
Division 11 - Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Furnishings and Accessories, Seating.
Division 13 - Special Construction, Radiation Protection.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Healthcare Communications and Monitoring Systems.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents