Similar Projects
Mill, AC Resurfacing, Pipe Work
Infrastructure
Conception
$1,319,000 CJ est. value
Harrold, SD 57536

Mill, AC Resurfacing, Pipe Work
Infrastructure
Conception
$1,319,000 CJ est. value
Harrold, SD 57536

2024 Areawide Pipe Work Projects
Infrastructure
Design
$710,000 CJ est. value
Pierre, SD 57501

RFQ Contractor - Big Bend Community Sewer Renovation
Infrastructure
Bidding
$500,000 CJ est. value
Harrold, SD 57536

Dam Maintenance and Concrete Spillway Repairs Lake Louise and Fate Dams, Hand and Lyman
Infrastructure
Bidding
$300,000 CJ est. value
Pierre, SD 57501

DOH Public Health Laboratory
New Construction, Infrastructure - 60,000 SF
Sub-Bidding
$53,000,000 CJ est. value
Pierre, SD 57501

2022 SDDOT Airport Pavement Maintenance
Term Contract, Infrastructure
Post-Bid
SD

RFP Constructin Manager at Risk Service - Kinsman Building Addition
Addition, Demolition, Infrastructure - 23,000 SF
Post-Bid
$1,300,000 CJ est. value
Pierre, SD 57501

Asphalt Surface Treatment
Infrastructure
Results

Road Reconstruction, Playhouse Road Custer State Park
Infrastructure
Results
$1,272,639 CJ est. value
Custer, SD 57730

Asphalt Concrete Repairs and Asphalt Surface Treatment North Central South Dakota AST Package
Infrastructure
Construction
$936,041 CJ est. value
Pierre, SD 57501

Asphalt Concrete Repairs and Asphalt Surface Treatment North Central South Dakota AST Package
Infrastructure
Construction
$936,041 CJ est. value
Pierre, SD 57501

OAHA YMCA Phase 2 Addition
Addition, Demolition, Build-out, Infrastructure
Pending Verification
$500,000 CJ est. value
Pierre, SD 57501

Urban Grading, Curb and Gutter, ADA, Signals, Storm Sewer, Lighting, AC Surfacing
Infrastructure
Conception
$15,094,000 CJ est. value
Harrold, SD 57536

RFP Construction Manager at Risk Services - Construction of an Athletic Facility
Addition, Demolition, Infrastructure
Bidding
$3,000,000 CJ est. value
Pierre, SD 57501

Last Updated 02/14/2024 08:39 AM
Project Title

Airport Improvements, Pierre Regional Airport

Physical Address View project details and contacts
City, State (County) Pierre, SD 57501   (Hughes County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Runways/Taxiways, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $6,510,854 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Rehabilitate Runway 7-25. Work items include but are not limited to asphalt pavement milling, asphalt pavement removal, earthwork, asphalt paving, pavement marking, erosion control, seeding, electrical removals, electrical installations, chain-link fence removal, chain-link fence installation, culvert installation, gravel/millings road grading, NAVAID removals, and NAVAID installations. Each bid in excess of $50,000.00 shall be accompanied by either a certified check, cashier's check or draft in a sum equal to five percent (5%) of the maximum bid price and drawn on a State or National Bank or a bid bond in a sum equal to ten percent (10%) of the maximum bid price executed by the Bidder as principal and by a surety company authorized to do business in the State of South Dakota, payable to the City of Pierre, conditioned that if the principal's bid be accepted and the contract awarded to him, he, within ten (10) days after Notice of Award has been executed, will execute and effect a contract in accordance with the terms of his bid and a contractor's bond as required by law and regulations and determinations of the governing board. The bid security of the two lowest bidders will be retained until the Notice of Award has been executed, but no longer than sixty (60) days. The bid security is a guarantee that the bidder will enter into contract for work described in the Proposal.The successful Bidder will be required to furnish a Contract Performance Bond, a Payment Bond in the full amount of the Contract, and proof of Contractor's Excise Tax License. Goals for minority participation for each trade: 7.9% Goals for female participation in each trade: 6.9%.Contact KLJ at 701-355-8400 if you have any questions. The City of Pierre reserves the right to hold all bids for a period of 60 days after the date fixed for the opening thereof to reject any and all bids and waive defects and to accept any bids should it be deemed for the public good and also reserves the right to reject the bid of any party who has been delinquent or unfaithful in the performance of any former contract to the Owner. Phase 3 shall be completed after Phase 1 and Phase 2 have been completed and between September 10, 2023 and September 15, 2023 Goals for minority participation for each trade: 7.9% Goals for female participation in each trade: 6.9% The Disadvantaged Business Enterprise (DBE) goal for this project is 9.71 percent

Details

Division 31 - Earthwork, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Airfield Signaling and Control Equipment.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents