Last Updated | 02/14/2024 08:39 AM |
Project Title | Airport Improvements, Pierre Regional Airport |
Physical Address | View project details and contacts |
City, State (County) | Pierre, SD 57501 (Hughes County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction, Runways/Taxiways, Shoreline/Erosion/Drainage, Site Development |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $6,510,854 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Rehabilitate Runway 7-25. Work items include but are not limited to asphalt pavement milling, asphalt pavement removal, earthwork, asphalt paving, pavement marking, erosion control, seeding, electrical removals, electrical installations, chain-link fence removal, chain-link fence installation, culvert installation, gravel/millings road grading, NAVAID removals, and NAVAID installations. Each bid in excess of $50,000.00 shall be accompanied by either a certified check, cashier's check or draft in a sum equal to five percent (5%) of the maximum bid price and drawn on a State or National Bank or a bid bond in a sum equal to ten percent (10%) of the maximum bid price executed by the Bidder as principal and by a surety company authorized to do business in the State of South Dakota, payable to the City of Pierre, conditioned that if the principal's bid be accepted and the contract awarded to him, he, within ten (10) days after Notice of Award has been executed, will execute and effect a contract in accordance with the terms of his bid and a contractor's bond as required by law and regulations and determinations of the governing board. The bid security of the two lowest bidders will be retained until the Notice of Award has been executed, but no longer than sixty (60) days. The bid security is a guarantee that the bidder will enter into contract for work described in the Proposal.The successful Bidder will be required to furnish a Contract Performance Bond, a Payment Bond in the full amount of the Contract, and proof of Contractor's Excise Tax License. Goals for minority participation for each trade: 7.9% Goals for female participation in each trade: 6.9%.Contact KLJ at 701-355-8400 if you have any questions. The City of Pierre reserves the right to hold all bids for a period of 60 days after the date fixed for the opening thereof to reject any and all bids and waive defects and to accept any bids should it be deemed for the public good and also reserves the right to reject the bid of any party who has been delinquent or unfaithful in the performance of any former contract to the Owner. Phase 3 shall be completed after Phase 1 and Phase 2 have been completed and between September 10, 2023 and September 15, 2023 Goals for minority participation for each trade: 7.9% Goals for female participation in each trade: 6.9% The Disadvantaged Business Enterprise (DBE) goal for this project is 9.71 percent |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |