Similar Projects
Fire Station Headquarters
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Barnwell, SC 29812

Chavis Road Overlay - Barnwell County
Infrastructure
Bidding
$927,000 CJ est. value
Blackville, SC 29817

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Construction of Pickleball Courts
Infrastructure
Post-Bid
$750,000 CJ est. value
Barnwell, SC 29812

Williston Elko Schools 2022 Renovations
Renovation, Infrastructure
Results
$1,100,000 to $1,300,000 est. value
Williston, SC 29853

Navy Base Intermodal Facility Advanced Work Package project
Demolition, Infrastructure
Results

Old Jack Road Paving Project
Infrastructure
Construction
$823,108 CJ est. value
Hilda, SC 29812

Old Jack Road Paving Project
Infrastructure
Construction
$823,108 CJ est. value
Hilda, SC 29812

Edisto REC Research Infrastructure Upgrades and Expansion - Clemson University
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$5,250,000 CJ est. value
Blackville, SC 29817

West Street to Springfield Road Water Line FY 2020
Infrastructure
Results
$1,730,089 CJ est. value
Williston, SC 29853

Addition to the Family Medical Center of Blackville
Addition, Demolition, Infrastructure - 500 SF
Post-Bid
$106,500 CJ est. value
Blackville, SC 29817

Water Filtration and Transmission Improvements
Infrastructure
Results
$3,218,231 CJ est. value
Williston, SC 29853

Taxiway Lighting Rehabilitation Barnwell Regional Airport
Infrastructure
Post-Bid
$175,000 CJ est. value
Barnwell, SC 29812

2023 Roadway Improvements Willow Creek Circle Road Paving Project
Infrastructure
Results
$840,637 CJ est. value
Williston, SC 29853

Sandy Hook Road - Dirt Road Paving
Infrastructure
Post-Bid
$600,000 CJ est. value
Williston, SC 29853

Last Updated 10/02/2023 05:03 PM
Project Title

Shuler Well Filtration System

Physical Address View project details and contacts
City, State (County) Williston, SC 29853   (Barnwell County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of 750-gpm water filtration system including site work, concrete pad, canopy (Add Alternate), backwash holding tank, 915 linear feet of gravity sewer, electrical, fencing and appurtenances Time allotted for construction is 360 consecutive calendar days for substantial and final completion. Consideration will be given for issuing the Notice to Proceed based upon anticipated delivery of materials. Proposals for the complete work in one general contract shall be made on the proposal form provided and shall contain prices in words and figures for the work bid on. This is a Section 3 Covered Project under the HUD Act of 1968 and Section 3 Residents and Business Concerns are encouraged to apply. The OWNER is committed to providing all persons with equal access to its services, programs, activities, education, and employment regardless of race, color, national origin, religion, sex, familial status, disability or age All Bidders must have a State of South Carolina Contractors WL4, WP4 or higher License No submitted bid may be withdrawn after the scheduled closing time for receipt of bids for a period of ninety (90) days All proposals shall be accompanied by a Bid Bond drawn in favor of the Town of Williston, in the amount of at least 10% of the lump sum bid for the complete work; such Bid Bond representing that the Bidder, if awarded the contract, will promptly enter into a contract and furnish Performance Bond and Payment Bond as provided by law and approved by the Attorney for the Town of Williston. Each bond shall be equal to 100% of the contract amount. The Bid Bond shall be forfeited to the Town of Williston as liquidated damages if the Bidder fails to execute the contract and provide Performance and Payment Bonds within 10 days after being notified that he has been awarded the contract. Upon receipt of all documents in undamaged condition within 30 days after the date of opening of bids, half of the deposit will be refunded. The Owner reserves the right to reject any or all bids and to waive informalities

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents