Similar Projects
2020 Road Program
Bidding
Long Branch, NJ

Maintenance Job Order Contracting (Joc) Infrastructure Repairs, Central - 2021
Bidding
$5,000,001 to $10,000,000 est. value

Improvements to Railroad Avenue
Post-Bid
Belmar, NJ 07715

Furnish and Deliver Concrete Pipes
Post-Bid
Freehold, NJ 07728

Improvements to Morris Avenue
Results
Spring Lake, NJ 07762

2019 Roadway Improvement Project
Results
Hazlet, NJ 07730

Drainage Improvements at 12 Carbury Road
Infrastructure
Bidding
Oakhurst, NJ 07712

Improvements to Euclid Avenue - Phase IV
Post-Bid
Loch Arbour, NJ 07711

2019 Capital Improvement Program
Results
$961,523 est. value
Union Beach, NJ

Smart Moves 2020 North
Infrastructure
Bidding
$5,000,001 to $10,000,000 est. value

Improvements to Corlies Avenue
Post-Bid
Allenhurst, NJ 07711

NJDOT FY 2019 Municipal Aid Project Improvements to Union Lane Phase I
Term Contract
Results
$442,113 est. value
Brielle, NJ 08730

2019 Roadway Improvement Program in the Borough of Interlaken, Monmouth County, New Jersey
Post-Bid
Interlaken, NJ 07712

2018 Road Improvement Program
Results
Matawan, NJ 07747

Worthington Avenue Outfall Improvements
Post-Bid
Spring Lake, NJ 07762

Last Updated 05/13/2021 10:18 AM
Project Title

2020 Roadway and Drainage Improvement Program

Physical Address View project details and contacts
City, State (County) Marlboro, NJ   (Monmouth County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project generally consists of the resurfacing of various roadways and addressing surface drainage concerns throughout the Township of Marlboro. The improvements include excavation, milling and the overlaying of roadways with hot mix asphalt 9.5M64 surface course, hot mix asphalt base repair where necessary, removal and replacement of deteriorated concrete curb, granite block curb and concrete curb and gutter where directed, installation of ADA curb ramps and detectable warning surfaces, traffic striping, and the reconstruction of inlets and the installation of bicycle safe grates and Type 'N' ECO inlet castings as required by the Tier "A" Municipal Stormwater Regulations, and stormwater management improvements as required. The improvements also include the installation or expansion subsurface stormater drainage systems including the installation of pipe and structures, along with the re-grading of the existing ground surface.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents