Similar Projects
PCC Improvements Concrete, Fence, Lights, Electrical
Alteration
Post-Bid
South Jordan, UT

Cement Work
Term Contract
Post-Bid
Fillmore, UT

Power Building Concrete Work
Results
Salem, UT 84653

2021 Eagle Mountain City Concrete Collar Replacement
Term Contract
Results
$35,000 est. value
Eagle Mountain, UT

2021 CDBYI Project (Community Development Building Yard Improvements)
Infrastructure
Post-Bid
Eagle Mountain, UT 84005

2100 N Line Foundations
Results
Less than $130,000 est. value
Lehi, UT

2022 Concrete Replacement
Alteration
Post-Bid
$813,991 est. value
Bountiful, UT

Patio Paver Replacement
Results
Salt Lake City, UT

Storm Water Prevention - Phase One, East High School
Infrastructure
Post-Bid
Salt Lake City, UT 84102

Concrete Demolition - Installation - Repair
Results
UT

Collector Wall Replacement
Infrastructure
Post-Bid
$750,000 CJ est. value
South Jordan, UT 84095

Removal and Replacement of Concrete
Term Contract
Results
Salt Lake City, UT

Murray Theater Renovation
Renovation
Post-Bid
$380,000 CJ est. value
Murray, UT 84107

USU Blanding Campus Concrete Replacement
Results
Logan, UT

Brinkerhoff and Hobbs LLC Project
Build-out
Post-Bid
$1,800,000 CJ est. value
Price, UT 84501

Last Updated 10/11/2022 12:34 AM
Project Title

Owens Corning MSA - Natural Gas

Physical Address View project details and contacts
City, State (County) Nephi, UT 84648   (Juab County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed under this project shall consist of furnishing all labor, materials and equipment required to construct the facilities and features called for by the CONTRACT DOCUMENTS and as shown on the DRAWINGS. All Work associated with this Project shall be in accordance with all applicable Federal, State, County and City requirements. The Owens Corning MSA Project will be limited to an intermediate-pressure hot tie in, steel pipeline construction, and constructing a new metering and regulation station. The City of Nephi (City) intends to hot tap an existing high-pressure natural gas steel line, install approximately 250 feet of 4-inch steel pipe from the hot tie-in to a new metering and regulation station East of Owens Corning in Nephi, Utah. A separate service line of approximately 100 feet of 4-inch low pressure steel will run from the new metering and regulation station to a new connection flange located above ground on the East outside wall of Owens Corning. The old meter set and service line will be removed/abandoned. The high-pressure line and station will operate with a Maximum Allowable Operating Pressure of 720 psig and an operating pressure of approximately 320 psig.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents