Similar Projects
Last Updated | 09/14/2022 02:36 AM |
Project Title | Haines Skyline Lift Station Pump Replacement |
Physical Address | View project details and contacts |
City, State (County) | Haines, AK 99827 (Haines County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Sewage Treatment Plant, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $100,000 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Haines Borough is seeking sealed bids from qualified contractors to perform the WWTP Generator Building Roof Replacement. The WORK covered in the Contract Documents outlines the requirements for this project. The Borough will provide the following materials: Two Flygt NX620.091 5.5 HP, 230 V 3 Phase "Concertor" Pumps with 65' of cable. One lockable weatherproof NEMA 4X Stainless Steel Pump Control Panel with aluminum inner dead front door duplex pump controls for the Flygt NX620.091 5.5 HP, 230 V 3 Phase "Concertor" Pumps One liquid level transponder, pressure type, with cable Two 4" flanged ball-check valves Two 4"pump discharge base plates with pump adapters Four 2" diameter, 20 ft long stainless steel pump guide rails Two top pump rail mounting brackets Two intermediate pump rail stabilizer brackets. The Engineer's Estimate for all the WORK detailed herein is $100,000.00 . Bid Open - Dial by your location +1 346 248 7799 US (Houston) +1 669 444 9171 US +1 669 900 6833 US (San Jose) +1 719 359 4580 US +1 253 215 8782 US (Tacoma) +1 301 715 8592 US (Washington DC) +1 309 205 3325 US +1 312 626 6799 US (Chicago) +1 386 347 5053 US +1 564 217 2000 US +1 646 931 3860 US +1 929 205 6099 US (New York) A Pre-Bid conference will not be held for this project. Q & AP Deadline 09/14/2022 09:00 PM EDT Deadline for bidder question - 09/14/2022 at 5PM Alaska time All questions related to this bid must be submitted through electronically, No in person, email, or phone questions will be answered. Completion of work - The work must be completed by October 31, 2022 BID BOND Bond Percentage 5.00% |
||||||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |