Similar Projects
SR 24/I-82 to Riverside Rd - ADA Compliance
Infrastructure
Conception
$321,000 CJ est. value
Mattawa, WA 99349

SR 24/I-82 to Riverside Rd - ADA Compliance
Infrastructure
Conception
$321,000 CJ est. value
Mattawa, WA 99349

RFQ Design - Architectural and Engineering Services for Replacement Hospital
Demolition, New Construction, Infrastructure
Design
$13,500,000 CJ est. value
Quincy, WA 98848

Priest Rapids Recreation Area Dredging and Bank Stabilization
Infrastructure
Design
$425,000 CJ est. value
Mattawa, WA 99349

RFQ D/B - I-405, Northeast 85th Street Interchange and Inline BRT Station Project
Infrastructure
Bidding
$210,000,000 CJ est. value
Kirkland, WA 98033

RFQ D/B - I-405, Northeast 85th Street Interchange and Inline BRT Station Project
Infrastructure
Bidding
$210,000,000 CJ est. value
Kirkland, WA 98033

Ephrata Headquarters Pedestrian Crosswalk Replacement
Infrastructure
Post-Bid
$90,000 est. value
Ephrata, WA

Dodson Road Overlay
Infrastructure
Post-Bid
Ephrata, WA

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

U-SE Road Overlay
Infrastructure
Results
$1,903,263 est. value
Ephrata, WA

RFQ - Stormwater Comprehensive Plan
Term Contract
Bidding
$476,000 CJ est. value
Moses Lake, WA 98837

SR 17 ET AL, NCR Seal 2022
Infrastructure
Post-Bid
$4,000,000 to $5,000,000 est. value

Miscellaneous COF Upgrades
Infrastructure
Results
$470,000 est. value
Moses Lake, WA

Airfield Pavement Maintenance
Term Contract
Post-Bid
Hoquiam, Quincy, WA 98550

Water and Sewer Phase Three Improvements
Infrastructure
Results
Soap Lake, WA

Last Updated 08/05/2022 03:35 PM
Project Title

Government Road Multi-Use Pathway

Physical Address View project details and contacts
City, State (County) Mattawa, WA 99349   (Grant County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $595,550 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**this project has been awarded to Double J Excavating, inc. ** This Contract provides for the construction of approximately 1,630 square yards of pathway and ADA compliant curb ramps along Government Road, from Steven Street to Manson Lane, including but not limited to excavation, embankment, grading, subgrade preparation, cement concrete curb, gutters, curb ramps, pathway, hot mix asphalt pavement, storm drainage improvements, pavement marking, miscellaneous surface restoration, permanent signing, traffic control and all other appurtenances required to complete the work, all in accordance with the attached Contract Plans, these Special Provisions, and the Standard Specifications. The Work shall be substantially complete within 45 working days after the commencement date stated in the Notice to Proceed. All bidding and construction is to be performed in compliance with the Contract Provisions and Contract Plans for this project and any addenda issued thereto that are on file at the office of the City Clerk, City Hall, Mattawa, Washington. The Proposals will be publicly opened and read aloud shortly after the time and date stated above. Proposals are to be submitted only on the form provided with the Bid Documents. All Proposals must be accompanied by a certified check, postal money order, cashiers check, or Proposal bond payable to the "City of Mattawa" and in an amount of not less than five percent (5%) of the total Proposal amount. All work performed on this project will be subject to the higher of the prevailing state or federal wage rates. The City of Mattawa is an Equal Opportunity and Affirmative Action Employer. Small, Minority-and Women-owned firms are encouraged to submit bids. Financing of the Project has been provided by City of Mattawa, Washington and The Washington State Community Development Block Grant program with federal funds from the U.S. Department of Housing and Urban Development. The City of Mattawa expressly reserves the right to reject any or all Proposals and to waive minor irregularities or informalities in any Proposal.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents