Similar Projects
Pill Call Window Installation
Bidding
Decatur, Hampton, Marietta, GA 30034

Pill Call Window Installation
Bidding
Decatur, Hampton, Marietta, GA 30034

Emergency Services Complex Storefront Installation
Post-Bid
Gainesville, GA 30501

Window and Exterior Door Replacements Comer
Post-Bid
Comer, GA 30629

Clerk of Courts Transaction Window/Secure Counter
Results
$25,000 to $100,000 est. value
Clyattville, GA 31601

Roof and Window Replacement
Results
Less than $34,000 est. value
GA

Exterior Window and Screen Cleaning Services
Bidding
Atlanta, GA

Safety Window Film Install
Post-Bid
$50,000 to $60,000 est. value
Evans, GA 30809

Replacement of the Entry Doors at the Gwinnett Justice and Administration Center
Results
Lawrenceville, GA 30046

Aluminum Porches Stairs Ramps and Railings for Portable Classrooms
Bidding
College Park, GA

Ocean Terminal Overhead Doors Installation
Post-Bid
Savannah, GA 31401

Coastal SP Glass Replacement Project
Results
Savannah, GA

N--TSCIF Door Delivery, Installation, and Removal of Old Door and Frame
Post-Bid
Fort Benning, GA 31905

TCMS Classroom Solarium Project
Results
Metcalf, GA 31792

Removal and Replacement of Access Hatches
Post-Bid
Atlanta, GA 30310

Last Updated 10/15/2020 10:49 AM
Project Title

DDWG Tension Fabric Structures Overhead Doors Replacement

Physical Address View project details and contacts
City, State (County) Warner Robins, GA 31098   (Houston County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Firm-Fixed Price (FFP) type contract for the removal and disposal of existing doors and the purchase and installation of eight (8) new overhead doors and to replace existing sheet type light duty overhead doors for DLA Distribution Warner Robins, GA (DDWG). The Contractor shall supply all labor and miscellaneous support equipment such as scissors lifts, ladders, forklifts, etc. All materials, and accessories furnished shall be new, complete, and of a quality necessary to meet the requirements as described herein. All work, materials, and services note expressly called for in the Statement of Work, or shown on the drawings, but which are necessary for complete and proper installation of new doors shall be performed and furnished by the Contractor at no increase in cost to the Government Opening preparation, miscellaneous or structural metal work, access panels, finish, or field electrical wiring, wire conduit, fuses, and disconnect switches are also in the scope of this work.

Details

Division 08 - Openings, Doors and Frames.
Division 13 - Special Construction, Fabric Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents