Similar Projects
Interior Painting
Renovation
Design
$60,000 CJ est. value
Crescent City, FL 32112

Hillsborough Community College HCC SouthShore Campus Exterior Painting Project
Renovation
Design
$95,934 CJ est. value
Ruskin, FL 33570

Pavement Markings and RPMs - Lake
Infrastructure
Sub-Bidding
$360,000 CJ est. value
Howey in the Hills, FL 34737

Pavement Markings, Symbols, Striping, and RPMs
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Seffner, FL 33584

Pre-Qualification Pool for Painting and Waterproofing Services
Term Contract
Post-Bid
Miami Beach, FL

Exterior Painting and Waterproofing Buildings
Alteration
Post-Bid
Gulfport, Largo, Palm Harbor, FL 33773

Airport Interior and Exterior Painting Services
Results
Gainesville, FL 32609

WTP Phase III Expansion
Addition, Alteration
Results
$800,000 est. value
Bonita Springs, FL

RPM Remove and Replace - Santa Rosa
Infrastructure
Sub-Bidding
$50,000 CJ est. value
Milton, FL 32570

Painting Services
Term Contract
Post-Bid
West Palm Beach, FL 33401

Nanofiltration Plant Painting
Alteration
Results
Dania Beach, FL 33004

Thermo and RPM Remove and Replace - Jefferson,Leon
Infrastructure
Sub-Bidding
$400,000 CJ est. value
Tallahassee, FL 32308

Interior Coating of 40,000 Gallon Hydro-Pneumatic Steel Tank
Alteration
Post-Bid
Clermont, FL

Painting for SBR Walls
Term Contract
Results
Homestead, FL 33030

Myrtle Avenue Operations Campus (MAOC) Building 2 Interior Painting Refresh
Renovation
Sub-Bidding
$50,000 CJ est. value
Jacksonville, FL 32204

Last Updated 10/03/2023 11:38 AM
Project Title

RPM Remove and Replace - Holmes,Walton,Washington

Physical Address View project details and contacts
City, State (County) Westville, FL 32425   (Holmes County)
Category(s) Single Trades
Sub-Category(s) Painting
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $150,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Improvements under this Work Document-Driven Contract consist of the removal and replacement of existing reflective pavement markers, along various state highways in Holmes, Walton and portions of Washington Counties. All reflective pavement markers removed shall be replaced in same workday. Maintenance of Traffic and Mobilization are incidental to pay items listed. This contract has a budgetary estimate of $150,000.00. The quantities shown on the Bid Price Proposal are approximate and only represent estimated planned requirements based on historical or specific project needs. The Department does not guarantee any maximum or minimum quantity, any range of quantities, or the exact quantities shown for each bid item. The Departments estimated quantities and the Contractors bid price will be used to calculate a total bid amount. This total bid amount will then be used to determine the low bidder; however, actual payment under the awarded contract will be based on actual quantities completed. For this Contract in which specific sites are not identified at the time of letting, the Engineer will issue a Work Document. Work Documents will identify the location, description, amount of work to be accomplished, and the number of calendar days to complete the work. A Proposal Guaranty will not be required on indefinite quantity contracts, such as work document driven contracts, with an advertised estimated budget amount of $150,000 or less regardless of the bid amount Counties: Holmes, Walton, Washington Road Name: Ponce De Leon Maintenance - Wdd Rpm Remove and Replace Limits: Midpoint Project(s): 42214337225(*) Federal Aid No: N/A Total Roadway Length: 0.000 Miles Total Bridge Length: 0.000 Miles Total Proposal Length: 0.000 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 15 Day Contract Days: 12/31/24 For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00. A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FLDOT - Call Order: 008 - RPM Remove and Replace - Holmes,Walton,Washington Question Deadline 10/05/2023 at 5:00 PM CT If You Have Any Technical Questions, You Must Go Through Our Bid Question & Answer Site. Question Posted to This Site on the Seventh Calender Days Prior to the Bid Opening Will Be Responded to by the Department. Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on Electronically.

Details

Division 09 - Finishes, Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents