Similar Projects
Last Updated | 10/03/2023 11:38 AM |
Project Title | RPM Remove and Replace - Holmes,Walton,Washington |
Physical Address | View project details and contacts |
City, State (County) | Westville, FL 32425 (Holmes County) |
Category(s) | Single Trades |
Sub-Category(s) | Painting |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected November 2023 |
Bids Due | View project details and contacts |
Estimated Value | $150,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Improvements under this Work Document-Driven Contract consist of the removal and replacement of existing reflective pavement markers, along various state highways in Holmes, Walton and portions of Washington Counties. All reflective pavement markers removed shall be replaced in same workday. Maintenance of Traffic and Mobilization are incidental to pay items listed. This contract has a budgetary estimate of $150,000.00. The quantities shown on the Bid Price Proposal are approximate and only represent estimated planned requirements based on historical or specific project needs. The Department does not guarantee any maximum or minimum quantity, any range of quantities, or the exact quantities shown for each bid item. The Departments estimated quantities and the Contractors bid price will be used to calculate a total bid amount. This total bid amount will then be used to determine the low bidder; however, actual payment under the awarded contract will be based on actual quantities completed. For this Contract in which specific sites are not identified at the time of letting, the Engineer will issue a Work Document. Work Documents will identify the location, description, amount of work to be accomplished, and the number of calendar days to complete the work. A Proposal Guaranty will not be required on indefinite quantity contracts, such as work document driven contracts, with an advertised estimated budget amount of $150,000 or less regardless of the bid amount Counties: Holmes, Walton, Washington Road Name: Ponce De Leon Maintenance - Wdd Rpm Remove and Replace Limits: Midpoint Project(s): 42214337225(*) Federal Aid No: N/A Total Roadway Length: 0.000 Miles Total Bridge Length: 0.000 Miles Total Proposal Length: 0.000 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 15 Day Contract Days: 12/31/24 For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00. A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FLDOT - Call Order: 008 - RPM Remove and Replace - Holmes,Walton,Washington Question Deadline 10/05/2023 at 5:00 PM CT If You Have Any Technical Questions, You Must Go Through Our Bid Question & Answer Site. Question Posted to This Site on the Seventh Calender Days Prior to the Bid Opening Will Be Responded to by the Department. Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on Electronically. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |